My WebLink
|
Help
|
About
|
Sign Out
RES 231414
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2023
>
RES 231414
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 10:58:40 AM
Creation date
10/23/2023 10:17:59 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/19/2023
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />29 | City of Pleasanton 2023-2031 Housing Element <br />Program 1.8 <br />Monitor the production of accessory dwelling units (ADUs) and junior accessory dwelling units <br />(JADUs) to determine if they are being rented and, if so, determine their rent levels. Per the City’s <br />updated ADU ordinance (2021), all ADUs must be registered in the City’s monitoring program to <br />determine rent levels of the ADUs being created. If it is determined that rent levels are exceeding <br />those projected in the inventory or that ADU production is not keeping pace with Housing Element <br />projections, the City will study and implement additional measures to encourage more production <br />of, and affordability among, ADUs, such as fee waivers or reductions in exchange for deed- <br />restricting a unit. <br />• Responsible Agency: Planning Division, Housing Division <br />• Time Period: Monitor annually (by April 1 of each year); if ADU targets are not being met <br />(i.e., 11.5 ADUs permitted on an annual average) by January 2025, review and revise <br />efforts to increase ADU construction (e.g., fee waivers, etc.) by July 2025 pending results <br />of monitoring. The City’s action shall be commensurate with the level of shortfall from <br />construction targets (i.e., if shortfall is significant, less than 80 percent of target, a rezoning <br />action may be required, if shortfall is slight, 80 percent of target or greater, additional <br />incentives may be appropriate). Review will occur every two years thereafter (i.e., January <br />2027 and January 2029) with action implemented within six months if targets are not being <br />met as described above (July 2027 and July 2029). <br />• Funding Source: Planning Division Budget, Housing Division Budget, Building and Safety <br />Division Budget <br />• Quantified Objective: 93 ADUs <br />• Geographic Targeting: Aim to achieve 50 percent of quantified objective for ADUs (i.e., 47 <br />ADUs) in highest resource areas and/or Racial or Ethnically Concentrated Areas of <br />Affluence (RCAAs) and areas of relatively higher income (i.e., see Appendix F, Figure F- <br />9: Median Household Income) <br /> <br />Program 1.9 <br />The following programs will be implemented to facilitate the production of ADUs: <br />1. Prepare and distribute standardized and/or pre-approved building plans for ADUs that <br />meet the requirements of Chapter 18.106 of the Pleasanton Municipal Code <br />(Accessory and Junior Accessory Dwelling Units) and the California Building <br />Standards Code. The City will publicize such building plans to interested persons <br />inquiring or applying for an ADU, and incentives provided, such as reduction of permit <br />fees, for applicants wishing to make use of such pre-approved plans. <br />2. Create and maintain informational materials and an ADU resource webpage on the <br />City’s website to publicize and promote the availability of standard building plans; post
The URL can be used to link to this page
Your browser does not support the video tag.