My WebLink
|
Help
|
About
|
Sign Out
4_Attachment
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
BICYCLE PEDESTRIAN AND TRAILS
>
2023
>
10232023
>
4_Attachment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2023 9:10:10 AM
Creation date
10/17/2023 9:06:39 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/17/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Page 2 of 10 <br /> <br />PROJECT DESCRIPTION: (300-word limit) <br />Please indicate project phase (Planning, PE, ENV, ROW, CON, O&M) <br /> <br />The City of Pleasanton will use STIP funds towards construction. <br /> <br />The interchange of 680 and Sunol Blvd will be modified by the addition of 3 new traffic <br />signals at the on/off ramps and at Castlewood Drive, the addition of 2 new on ramp lanes <br />(1 multipurpose and 1 high Occupancy lane), new Class IV protected bicycle facilities on <br />Sunol Blvd from Arlington Road through the interchange to Castlewood Dr., widening of the <br />I-680 bridge over Sunol Blvd to accommodate lane acceleration, sound walls, and lane <br />restriping. The project completed the PSR-PDS phase in 2020. The PA&ED phase <br />resulted in a CEQA IS/MND document. Caltrans is reviewing the second administrative <br />final IS/MND document. It is anticipated that the document will be approved in October <br />2023. <br /> <br /> <br />See attached, PSR-PDS <br /> <br /> <br /> <br />CONTACT INFORMATION <br /> <br />Contact Name & Title: <br /> Cedric Novenario <br />Contact Email: <br />cnovenario@cityofpleasantonca.gov <br />Contact Phone: <br />925-931-5667 <br />Agency: City of Pleasanton <br /> <br />Topic CS Policy Consideration YES NO Required Description <br />1. Bicycle, <br />Pedestrian <br />and Transit <br />Planning <br /> <br />Does Project implement relevant <br />Plans, or other locally adopted <br />recommendations? <br />Plan examples include: <br />• City/County General + <br />Area Plans <br />• Bicycle, Pedestrian & <br />Transit Plan <br />• Community-Based <br />Transportation Plan <br />• ADA Transition Plan <br />• Station Access Plan <br />• Short-Range Transit Plan <br />• Vision Zero/Systematic <br />Safety Plan <br /> Please provide detail on <br />Plan recommendations <br />affecting Project area, if <br />any, with Plan adoption <br />date. <br />If Project is inconsistent <br />with adopted Plans, <br />please provide <br />explanation. <br /> <br />The proposed <br />improvements for this <br />project are consistent <br />with what is described in <br />the city’s bicycle and <br />pedestrian master plan. <br />The Pleasanton Bicycle <br />and Pedestrian Master <br />Plan was adopted in
The URL can be used to link to this page
Your browser does not support the video tag.