My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
101723 REGULAR
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 10:22:31 AM
Creation date
10/13/2023 9:40:19 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/17/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 4: Preferred Alternative and Implementation Plan Water Supply Alternatives Study <br />4-8 <br />DRAFT for review purposes only. Use of contents on this sheet is subject to the limitations specified at the end of this document. <br />Water Supply Alternatives Study-Draft Report.docx <br />ď€Contractor procurement <br />ď€Construction of pipelines and connecting infrastructure <br />4.Finance. The estimated total project cash flow requirements are shown in Figure 4-2 by fiscal <br />year (i.e., July 1 to June 30).
The URL can be used to link to this page
Your browser does not support the video tag.