My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
101723 REGULAR
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 4:41:17 PM
Creation date
10/11/2023 4:41:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/17/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wilson Ganeral Contracting Inc. Proposal <br /> 1852 W 11 St., Suite 149 <br /> Tracy, CA 95376 D ��FE <br /> (925)915 1606 <br /> WILSOWILSON w-generalcontractor@yahoo.com SEP 0 7 2023 <br /> N V http://www.wilsongeneralcontracting.com <br /> CITY CLERK OFFICE <br /> ADDRESS <br /> City of Pleasanton <br /> DATE <br /> Mechanic Shop 09/04/2023 <br /> 3333 Busch Road <br /> P.O. Box 520 <br /> Pleasanton, CA 94566 <br /> ACTIVITY OTy <br /> RATE AMOUNT <br /> Installation 1 119,260.00 119,260.00 <br /> Install Rmax thermasheath 3.0" R value 20.3 <br /> Install Rmax insulation all through out the :. <br /> mechanic shop secure all rigid insulation with <br /> L channel brackets, tape all sims with 3m foil <br /> tape metal roof ceiling. 6,500 sq ft. labor to <br /> install. <br /> Materials 1 58,021.00 58,021.00 <br /> Rmax thermasheath 3.0 glue and situ tape <br /> fastening screws bracket straps to hold down <br /> insulation L channel bracket to support rigid <br /> insulation. <br /> Tod Rental 1 3,500.00 3,500.00 <br /> Scissor lift Qty 2 for 4 weeks. <br /> Pad and Protection 1 4,000.00 4,000.00 <br /> cover work area, tools and vehicles with <br /> plastic section off the area if needed. <br /> Remove and dispose plastic garbage <br /> everyday. Set up and break down all work <br /> area. <br /> No permit or fees included in this proposal. Contractor cannot <br /> guarantee all area will be insulated due to accessibility of certain <br /> areas and junction box, brackets and sprinkler system, pipes, TOTAL $184,781 .00 <br /> rafters, hoses, and metal framing.Any changes on scope of <br /> work will be change order. THANK YQQ. <br />
The URL can be used to link to this page
Your browser does not support the video tag.