My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
101723 REGULAR
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 4:41:17 PM
Creation date
10/11/2023 4:41:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/17/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT <br /> EXHIBIT A - SCOPE OF SERVICES <br /> • City Project Manager- Project Manager will be the Facilities Supervisor or his Designee <br /> • Contractor Entry into OSC —Contractor will need to provide a list of all employee's names. Once <br /> approved, Contractor will be issued a temporary Proximity Card for on-site entry to project location. <br /> Contractor will be responsible to gaining access to the OSC yard for his employees and <br /> subcontractors. At the end of the Projector Contractor must return the Proximity Card back to the <br /> Project Manager. <br /> • Hours of Services—will be lam to 3:30pm; any variation in start/end times must be approved prior <br /> to with the Project Manager and agreed upon by both parties <br /> • Uniforms - Contractor's crews should be identified either by a Company uniform, or by a safety <br /> vest worn outside other clothing with the Company name clearly displayed <br /> • Materials - Contractor shall furnish, as part of this agreement, all necessary personnel, supplies and <br /> materials needed for the completion of the identified project. Contractor will be responsible for <br /> removing and disposing of any construction waste. Debris and trash shall be removed at the end of <br /> each day's work. All defective materials shall be removed in accordance with all applicable rules, <br /> regulations, codes, law, ordinances, statues, etc. <br /> • Equipment and Tools —Contractor is responsible for supplying all necessary equipment and tools <br /> to perform the project as outlined, whether owned or rented with a third-party agency <br /> • Supervision - Contractor must provide for adequate supervision and inspection of all work <br /> performed to ensure that each requirement of these specifications is consistently met <br /> • Communication -A supervisor/foreman representing the contractor shall be readily available to <br /> meet with the Project Manager or Designee as needed for the purposes of correcting problems, <br /> conflicts, and coordinating work schedules <br /> • Inspection - Inspection by Project Manager or Designee shall be made during normal City operating <br /> hours, unless otherwise arranged <br /> • Satisfaction - The progress and standard of quality of work to be accomplished shall be to the <br /> degree reasonably acceptable to the Project Manager. In the event the Project Manager or his <br /> designee determines contractor's work is unsatisfactory, contractor will be required to perform the <br /> additional work at no cost to the City <br /> • Damages -All damages to sprinklers and/or surrounding work areas shall be reported by Contractor <br /> to the City and will be repaired by the Contractor at no additional cost <br /> • Safety - All OSHA Safety Requirements must be adhered to by the Contractor and/or any <br /> subcontractors while on-site <br />
The URL can be used to link to this page
Your browser does not support the video tag.