My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
101723 REGULAR
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 4:41:17 PM
Creation date
10/11/2023 4:41:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/17/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> The City has established a 20-year Repair and Replacement Plan, which annually <br /> provides a schedule for maintenance and preventative maintenance work for City <br /> buildings, such as interior and exterior facility painting, HVAC replacement, and <br /> remodeling and renovating City-owned facilities. Periodically, the City has utilized <br /> general contractors to most efficiently complete some work plan projects. <br /> DISCUSSION <br /> During a routine annual fire inspection by the Livermore-Pleasanton Fire Department, it <br /> was noted that the insulation in the roof of the Public Works mechanic shop needed to <br /> be removed and replaced. During the intense heat of summer, temperatures have been <br /> measured upwards of 130 degrees inside the building, which is unsuitable for proper <br /> working conditions. A Request for Bids (RFB) for insulation improvements for the <br /> mechanic shop was distributed. On August 28, 2023, staff conducted a mandatory pre- <br /> bid conference, which three potential contractors attended; of these, only Wilson <br /> General Contractor Inc. submitted a bid proposal in the amount of$184,781. Having a <br /> contractor allows the City to complete several projects simultaneously through a <br /> competitive pricing process. As such, staff recommends approval of a Maintenance and <br /> Trade Services Agreement with Wilson General Contractor, Inc. in the amount of <br /> $212,498, inclusive of a 15 percent contingency, for Fiscal Year 2023/24. <br /> Submitted by: Fiscal Review: Approved by: <br /> Norm Dorais Susan Hsieh Gerry Beaudin <br /> Interim Director Director of Finance City Manager <br /> of Public Works <br /> Attachment: <br /> 1. Maintenance and Trade Services Agreement with Wilson General Contractor, <br /> Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.