Laserfiche WebLink
Scope of Work <br /> Preparation of Plans,Specifications and Estimates <br /> Sunol Boulevard/I-680 Improvements Project <br /> August 21,2023 <br /> This proposal assumes seven (7) Preliminary Title Reports (PTR) will be required <br /> totaling $14,000. Actual PTR costs will apply. <br /> This proposal assumes five (5)existing plottable easements per acquisition parcel. <br /> This proposal includes three (3) sheets for the Base Mapping and three (3) sheets <br /> for the Appraisal Mapping deliverables. Sheets in excess of three (3) will be <br /> charged at the calculated per sheet rate appropriate for each deliverable. <br /> This proposal includes fourteen(14) Plat and Legal packages, including six (6) <br /> fee acquisitions and eight(8)new permanent easements. TCE's are not included. <br /> This proposal includes the initial submittal and two subsequent submittals for <br /> both the Appraisal Mapping and Plat and Legal Package deliverables. Revisions <br /> and/or resubmittals due to client changes,engineer changes, landowner changes, <br /> or changes for any other reason beyond the surveyor's control will be billed as <br /> T&M. <br /> For scheduling purposes, the start of office surveying services related to ROW <br /> Engineering tasks will begin once all PTR's have been received. <br /> • Blending of various DTM's such as those generated from aerial photogrammetry, <br /> MTLS, and conventional surveys is not included. <br /> Page 43 of 42 <br />