Laserfiche WebLink
Scope of Work <br /> Preparation of Plans,Specifications and Estimates <br /> Sunot Boulevard/I-680 Improvements Project <br /> August 21,2023 <br /> AECOM environmental staff will work with the project design team to ensure that the <br /> PS&E plans and Section 14 SSPs reflect permit requirements including environmentally <br /> sensitive area fencing, tree protection areas, species protection areas, seasonal work <br /> windows, and other restrictions. <br /> Task 8 Deliverables <br /> • Historic Properties Survey Report, Archaeological Survey Report, and Area of <br /> Potential Effects map <br /> • USFWS Biological Assessment(with lighting analysis) <br /> • Caltrans Categorical Exclusion Checklist and a NEPA Categorical Exclusion <br /> Determination Form <br /> • Technical Report Addenda(up to 3) <br /> • Paleontological Mitigation Plan Update Memo <br /> • NEPA/CEQA Re-Validations/Environmental Commitment Records (up to 2 <br /> iterations) <br /> • Application for CDFW Streambed Alteration Agreement Notification(Section <br /> 1602 permit) <br /> • Application for CDFW Incidental Take Permit <br /> • Application for USACE Section 404 permit <br /> • Application for RWQCB Section 401 Water Quality Certification and/or Report <br /> of Waste Discharge <br /> TASK 9 ADDITIONAL SERVICES <br /> This task includes additional services that may be required during design or bidding and <br /> construction phases of the project, such as additional traffic analysis, additional traffic <br /> engineering design, additional civil engineering design, additional bid and construction <br /> support, additional data collection, additional potholing, or additional meeting with <br /> stakeholders, utilities, or public outreach meetings. AECOM will only provide such <br /> services if requested and authorized by the City in writing. Approved additional services <br /> will be compensated on a time and material basis for an agreed-upon not-to exceed <br /> amount in accordance with the rate set forth in the submitted fee schedule. <br /> Page 33 of 42 <br />