My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
091923 SPECIAL
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 1:46:51 PM
Creation date
9/13/2023 1:46:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/19/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Effects Found not to be Significant <br /> CEQA Guidelines Section 15143 establishes that EIRs shall focus on significant impacts on the <br /> environment and need not discuss in detail effects that are clearly insignificant or unlikely to occur(e.g., <br /> aviation safety risks).Topics that will be addressed include agriculture and forestry resources;geology, <br /> soils, and seismicity;mineral resources; population and housing,and recreation. <br /> Other CEQA Required Sections <br /> This section will address the CEQA-required issues of significant environmental effects that cannot be <br /> avoided(CEQA Guidelines Section 15126(b)),significant irreversible environmental changes(CEQA <br /> Guidelines Section 15126(c)),growth inducement(CEQA Guidelines Section 15126(d)), and energy <br /> conservation (CEQA Guidelines Appendix F). <br /> Persons and Organizations Consulted/List of Preparers <br /> In accordance with CEQA Guidelines Section 15129,the EIR will identify all agencies,organizations, and <br /> individuals consulted during the preparation of the document,as well as the agency representatives and <br /> firms that were involved with EIR preparation. <br /> References <br /> This section will list all resources used in the preparation of the EIR. <br /> Technical Appendices <br /> Pursuant to CEQA Guidelines Section 15147,supporting technical information will be appended to the <br /> EIR as technical appendices.This includes but is not limited to technical studies, modeling data, and <br /> correspondence. <br /> Deliverobles <br /> • Ten(10) hard copies of the Administrative Draft EIR to the City <br /> • One(1)electronic version of the Administrative Draft EIR to the City <br /> Task 5: Screencheck Draft EIR <br /> Upon receipt of final City staff comments on the Administrative Draft EIR, FCS will prepare a Screencheck <br /> Draft EIR that shows edits in track changes. <br /> Deliveroble <br /> • One(1)electronic version of the Screencheck Draft EIR to the City <br /> Task 6: Draft EIR <br /> Upon receipt of final City staff comments on the Screencheck Draft EIR,FCS will proceed with finalizing and <br /> producing the Draft EIR for public review.This task assumes technical staff time to complete revisions to <br /> the Draft EIR, plus editing and administrative staff time to prepare the document for publication.If <br /> additional hours are required,we will prepare a budget augment to cover the actual level of effort. <br /> NORTH AMERICA I EUROPE I AFRICA I AUSTRALIA I ASIA <br /> FIRSTCARBONSOLUTI ONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.