My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
091923 SPECIAL
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 1:46:51 PM
Creation date
9/13/2023 1:46:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/19/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Existing <br /> • Existing plus project <br /> • Existing plus background (approved & pending projects) <br /> • Existing plus background plus project <br /> • Cumulative <br /> • Cumulative plus project <br /> d. Calculate daily forecasts on Dublin Canyon Road for above scenarios <br /> 3. Site circulation and related issues <br /> a. Evaluate pedestrian, bicycle and transit impacts related to the project. <br /> b. Evaluate adequacy of circulation and parking for residential site and EBRP staging area. <br /> c. Provide conceptual recommendations for striping and signing along Dublin Canyon Road <br /> near the project. Indicate where, if any, pavement widening is required to accommodate any <br /> revised striping.Consider both project traffic issues and collision history in the area. <br /> d. Determine project-related VMT. <br /> 4. Report <br /> a. Using City of Pleasanton significance criteria,determine any significant impacts and appropriate <br /> mitigation measures. Identify Project fair share requirements for mitigation measures. <br /> b. Prepare administrative draft free-standing traffic impact study for project <br /> c. After receiving comments, prepare final traffic study for project <br /> d. Provide any requested review and comments on CEQA document traffic section prepared by <br /> others. <br /> e. Respond to CEQA document comments T&M basis. <br /> Cumulative Effects <br /> In accordance with CEQA Guidelines Section 15130,the EIR will address the cumulative effects of the <br /> proposed project in combination with other projects.As set forth in the CEQA Guidelines, the cumulative <br /> analysis will focus on impacts to which the project has made a significant incremental contribution.The <br /> analysis will reflect the severity of the impacts and their likelihood of occurrence,and will be guided by <br /> standards of practicality and reasonableness. <br /> Alternatives <br /> Pursuant to CEQA Guidelines Section 15126.6, the EIR will evaluate a range of feasible alternatives to the <br /> proposed project.One of the alternatives will be the CEQA-mandated "No Project Alternative,"which is <br /> the circumstance under which the project does not proceed. FCS will evaluate up to two additional <br /> alternatives, likely consisting of a reduction in project size or potentially a refinement of proposed <br /> residential lot locations to better comply with City policies. In addition,the Alternatives section will <br /> address the feasibility of an alternative location, as well as any alternatives that were initially considered <br /> but rejected from further consideration. <br /> NORTH AMERICA I F MOPE I AFRICA I AUSTRAI IA I ASIA <br /> FIRSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.