Laserfiche WebLink
The proposed pad elevations range from 446 feet to 594 feet.According to the City's Water Distribution <br /> System Master Plan Update (November 2004),the water pressure at all building pads must be 40 psi or <br /> more during peak hour demand.Additionally the fire marshal has stated that the fire hydrant flow for <br /> the Project must be 1,500 gallons per minute. It is currently believed that the Project will be served by <br /> the Dublin Canyon water pressure zone and the Moller 770 water pressure zone. <br /> For the CEQA review, Ninyo & Moore will review the applicant's evaluation of water supply and <br /> distribution and associated recommendations for system improvements. FCS will evaluate impacts on <br /> public service and utility providers and evaluate the proposed project's impacts in terms of the need to <br /> construct new or expanded existing facilities, acquire additional supplies, generate effluent that exceeds <br /> the permitted capacity, etc. FCS will use information provided by the applicant about proposed utility <br /> demands and facilities. For other areas, FCS information provided by the City of Pleasanton and <br /> service/utility providers about service levels,the adequacy of existing infrastructure, and similar topics. <br /> WRECO will review the Project plans for the water main and sanitary sewer systems being prepared by <br /> the applicant.The review will be to check for conformance to regulatory requirements and City <br /> standards. <br /> Transportation <br /> As noted in the RFP,TJKM,will prepare a traffic impact analysis for use in preparing the EIR.Accordingly, <br /> FCS will summarize the analysis and will include any recommendations as mitigation measures.The <br /> following activities are proposed by TJKM: <br /> 1. Existing conditions <br /> a. Conduct field review of traffic conditions and field conditions <br /> b. Obtain a.m. and p.m. peak hour counts at study intersections <br /> • Dublin Canyon Road at Schaefer Ranch Road <br /> • Dublin Canyon Road at Canyon Creek/East Project access <br /> • Dublin Canyon Road at Canyon Meadows entrance <br /> • Dublin Canyon Road at Foothill Road <br /> • Foothill Road at 1-580 EB ramps <br /> • Foothill Road at 1-580 WB ramps <br /> • Foothill Road at Stoneridge Drive <br /> • Stoneridge Drive at Stoneridge Mall Road <br /> • Stoneridge Drive at 1-680 SB ramps <br /> • Stoneridge Drive at 1-680 NB ramps <br /> c. Obtain 24 hour counts on Dublin Canyon Road near project site <br /> d. Calculate existing a.m. and p.m. level of service at study intersections <br /> e. Evaluate collision history on Dublin Canyon Road near project site <br /> 2. Project conditions <br /> a. Determine trip generation for both residential and EBRP staging areas <br /> b. Determine trip distribution and assignment for project traffic <br /> c. Calculate intersection LOS conditions for the following scenarios <br /> NORTH AMERICA I FORCIPE I AFRICA I AUSTRALIA i ASIA <br /> FIRSTCARBONSOLUTIONS.COM <br />