Laserfiche WebLink
FIRSTCARBON Proposal <br /> SOLUTIONS,14 <br /> Key Issues <br /> There are several key issues that will require evaluation in the EIR: <br /> 1. Measures PP and QQ <br /> The project includes grading within 100 feet of a ridgeline and also proposes grading on slopes in <br /> excess of 25 percent.The city is currently reviewing the application materials and may require <br /> refinements to the site plan in light of Measure PP. <br /> The project proposes the dedication of approximately 70 acres to EBRPD,which appears to meet <br /> the intent of Measure QQ and Open Space Policy 6 to encourage the preservation of scenic <br /> hillsides and ridgelines,and to study the feasibility of preserving large open-space areas in the <br /> Southeast Hills by a combination of private open-space and a public park system. <br /> " <br /> 14 .a <br /> I <br /> : F 0 r � -`-i� J •" a�� <br /> J �� <br /> Ijl .r�•..� ,f � �f f <br /> I ® J <br /> m <br /> rProject Site <br /> ———— Limit of Grading <br /> NORTH AMERICA I EUROPE I AFRICA I WSTR"I ASIA <br /> FIRSTCARBONSOLUTIONS.COM 2 <br />