Laserfiche WebLink
3.07 <br /> <br />Transportation/Circulation Impacts (Additional Traffic, Congestion, parking, Haz- <br />ards, etc.) (Cont.): <br /> <br />are projected to operate at LOS E/F conditions. Mitigations for these generally require <br />completion of major planned infrastructure which is funded through developer fees/exac- <br />tions and City general funds. Many of these are being studied as part of the City,s Gen- <br />eral Plan Update. The project has contributed toward its local traffic fee by "pre-paying" <br />for the Vineyard Avenue-Tawny Drive-Bernal Avenue traffic signal, an improvement <br />which eliminated the adverse level of service at that intersection. <br /> <br />The project's design accommodates turning/stacking movements satisfactorily, and it <br />provides adequate on-site parking to meet anticipated demand. <br /> <br /> May be <br />Significant <br /> <br />X <br /> <br />Insignificant <br /> <br />Insignificant <br />if Mitigated <br /> <br />3.08 Noise Impacts (Increases, Exposure to High Levels, etc.): <br /> <br />Building and site construction would result in construction equipment noise. Construc- <br />tion equipment would be required to meet DMV noise standards and be equipped with <br />muffling devices. <br /> <br />May be <br />Significant <br /> <br />X <br /> <br />Insignificant <br /> <br />Insignificant <br />if Mitigated <br /> <br />3.09 Impacts on Public Services (Fire, Police, Schools, Parks, Maintenance, etc.): <br /> <br />The proposed project is expected to have a negligible increase in police, fire, and para- <br />medic services. <br /> <br />May be <br />Significant <br /> <br />X <br /> <br />Insignificant <br /> <br />Insignificant <br />if Mitigated <br /> <br />3.10 Impact on Utilities (Water, Sewer, Storm Water Drainage, Solid Waste, etc.): <br /> <br />Public street infrastructure including curb, gutter, and sidewalks; streets; and water, <br />storm, and sanitary sewer facilities are available to serve the proposed development on <br />this site. All on-site infrastructure would be installed by the project developer, subject to <br />City standards. <br /> <br />SR:04:265 October 19, 2004 <br />Page 5 of 8 Exhibit "B '~, Initial Study/Negative Declaration <br /> <br /> <br />