Laserfiche WebLink
To track the individual design and construction contracts, staff recommends the interim <br /> water improvements be separated into three new Capital Improvement Program <br /> projects as follows: <br /> • Turnout 4 Replacement and Booster Station and Stoneridge Drive 24-Inch Potable <br /> Water Main (F-1 Line), CIP No. 24171 <br /> Recommended to be funded from the transfer of $180,426 and $551 ,061 from the <br /> Annual Water Distribution System Improvements, CIP No. 23183 and 24183, <br /> respectively. A professional services agreement with Woodard & Curran for $666,365 <br /> (see Attachment 3) and the design contingency of $65,122 will be billed toward CIP <br /> No. 24171 . <br /> • Bernal Avenue 18-Inch Potable Water Main (F-4 Line), CIP No. 24172 <br /> Recommended to be funded from the transfer of $133,000 from the Annual Water <br /> Distribution System Improvements, CIP No. 24183. A professional services <br /> agreement with Pakpour Consulting Group, Inc. for $121 ,216 (see Attachment 4) and <br /> the design contingency of$11 ,784 will be billed toward CIP No. 24172. <br /> • Sunol Boulevard 20-Inch Potable Water Main (F-7 Line), CIP No. 24173 <br /> Recommended to be funded from the transfer of $255,000 from the Annual Water <br /> Distribution System Improvements, CIP No. 24183. A professional services <br /> agreement with Mark Thomas & Company, Inc. for $231,906 (see Attachment 5) and <br /> the design contingency of$23,094 will be billed toward CIP No. 24173. <br /> To expedite the work, the on-call consultants have started preliminary design work <br /> under task authorizations as part of existing on-call contracts with the City. Additional <br /> task authorizations are issued as designers identify critical tasks that need to move <br /> forward. The task authorizations will be merged with the new contracts to ensure the <br /> proposed contract totals are not exceeded. <br /> A construction funding strategy will be developed after completing the 35 percent design <br /> estimates. Once the full scope of the project is defined and construction costs are better <br /> understood, the projects will be brought to the City Council for review, although it is <br /> anticipated that total construction costs are likely to exceed the project expenses of $6 <br /> million that were included in the proposed water rate increases presented to the City <br /> Council on July 18, 2023. The City recently received various grant funding to address <br /> PFAS and is working with the various grant sponsors to confirm that the grant funding <br /> can be used toward the interim water improvements. <br /> Schedule <br /> The design of the water line improvements is anticipated to be completed by the end of <br /> 2023, with some of the projects going to bid before the end of the year. Construction of <br /> the water lines is anticipated to start in February/March 2024 with the goal of having <br /> them in service by the peak demands of summer 2024 but timing is highly dependent on <br /> the availability of materials. The booster pump is anticipated to be completed by the end <br /> of 2024. The award of the pre-purchase of the booster station and possible purchase of <br /> identified long lead items will be presented to the City Council this fall. <br /> Page 9 of 10 <br />