My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
081523 SPECIAL
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 2:11:13 PM
Creation date
8/9/2023 2:11:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/15/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A-1 <br /> 40"V4901t,+ <br /> SUCCESS BUILT ON SERVICE, QUALITY, & <br /> COMMITMENT SINCE 1976 <br /> 7/28/2023 <br /> 5310.01 <br /> Adam Nelkie <br /> City of Pleasanton <br /> 200 Old Bernal Ave <br /> Pleasanton, CA 94566 <br /> Re: 11t/Bernal Intersection Improvements Amendment Request <br /> Dear Adam, <br /> As we have discussed, over the course of the subject project HMH has provided services in <br /> excess of that which is identified in our agreement to support the development of the subject <br /> project and interface with adjacent on-going construction activities. This letter seeks to initiate <br /> an amendment to authorize billing of these works: <br /> Main Street Bulb Out and Sidewalk Extension <br /> Increase the limits of the project to include reconstruction of the northern <br /> sidewalk between the 1St / Bernal intersection and the Main St / Bernal Avenue <br /> Intersection. Construct new bulb-out and ADA ramps at the northeast corner of <br /> the Main St / Bernal Avenue intersection. <br /> Civic Park Landscape and Mon_umentation Sign Replacement <br /> Increase the limits of the project to include replacement of landscaping in civic <br /> park including planting and irrigation work. Added work to remove and replace <br /> the existing monumentation sign in Civic Park, including lighting. <br /> School District Onsite Work <br /> After discussion with Pleasanton Unified School District (PUSD) representatives, <br /> the project scope was increased to reconstruct drainage systems and on-site <br /> utilities beyond the limits of the City's right-of-way and that which was assumed <br /> at the time of scoping. This task includes meetings with PUSD personnel on-site <br /> to discuss project impacts and improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.