My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
071823 SPECIAL
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2023 12:23:48 PM
Creation date
7/12/2023 12:22:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/18/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Weed Control W <br /> 3. Irrigation Scheduling 8 times yearly <br /> 4. Irrigation Repair Check Q <br /> 5. Fertilize TY (Spring & Fall) <br /> 7. Plant Replacement TY (Spring& Fall) and As Needed <br /> 8. Replacement of Mulch TY(Spring & Fall) and As Needed <br /> G. PAVED AREAS FREQUENCY <br /> 1. Leaf, Litter and Trash Removal W <br /> 2. Weed Control W <br /> 3. Graffiti Removal EX <br /> 4. Adding and compacting DG EX <br /> 5. Repair of Ruts Caused by off Road EX <br /> Parking or Erosion <br /> SECTION 2. GENERAL CONDITIONS <br /> 2.01 General <br /> The Contractor shall not be held responsible for plant losses due to maladies beyond the <br /> Contractor's control; this includes, but is not limited to, disease or insect attack for which <br /> there is no legal recommended control, acts of vandalism, earthquakes, fires, unusual <br /> storms, and related events. Report all such conditions to the City in writing and submit a <br /> proposal for the repair of the work. Obtain the City's approval prior to proceeding with <br /> the work affected. <br /> 2.02 Replacement of Plants <br /> The Contractor shall remove dead and irreparably damaged groundcover,trees, shrubs, <br /> hanging flower basket plantings, or other plant material and replace it at his own expense <br /> when such death or damage is due to Contractor's failure to provide maintenance and/or <br /> sufficient irrigation in accordance with the provisions herein. Contractor shall remove <br /> and replace such plant material within two weeks of notification by the City. Plants shall <br /> be replaced with material of equivalent size and variety to material being removed unless <br /> other material is approved by the City. All replacement material shall be approved by the <br /> City before installation by the Contractor. <br /> 2.03 Work Not Included <br /> A. Repairs or replacement of losses and damages not covered by the contract, <br /> except as noted. <br /> B. New planting and other special services, except with City's request or <br /> approval in writing and agreement to pay. <br /> C. Major vandalism or damage caused by natural disasters. <br /> Cemetery Scope of Work 20219-2 rev4 <br /> Rev. 11/29/2021 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.