Laserfiche WebLink
2. Weed Control W <br /> 3. Irrigation Scheduling 8 times yearly <br /> 4. Irrigation Repair Check Q <br /> 5. Fertilize TY (Spring & Fall) <br /> 7. Plant Replacement TY (Spring& Fall) and As Needed <br /> 8. Replacement of Mulch TY(Spring & Fall) and As Needed <br /> G. PAVED AREAS FREQUENCY <br /> 1. Leaf, Litter and Trash Removal W <br /> 2. Weed Control W <br /> 3. Graffiti Removal EX <br /> 4. Adding and compacting DG EX <br /> 5. Repair of Ruts Caused by off Road EX <br /> Parking or Erosion <br /> SECTION 2. GENERAL CONDITIONS <br /> 2.01 General <br /> The Contractor shall not be held responsible for plant losses due to maladies beyond the <br /> Contractor's control; this includes, but is not limited to, disease or insect attack for which <br /> there is no legal recommended control, acts of vandalism, earthquakes, fires, unusual <br /> storms, and related events. Report all such conditions to the City in writing and submit a <br /> proposal for the repair of the work. Obtain the City's approval prior to proceeding with <br /> the work affected. <br /> 2.02 Replacement of Plants <br /> The Contractor shall remove dead and irreparably damaged groundcover,trees, shrubs, <br /> hanging flower basket plantings, or other plant material and replace it at his own expense <br /> when such death or damage is due to Contractor's failure to provide maintenance and/or <br /> sufficient irrigation in accordance with the provisions herein. Contractor shall remove <br /> and replace such plant material within two weeks of notification by the City. Plants shall <br /> be replaced with material of equivalent size and variety to material being removed unless <br /> other material is approved by the City. All replacement material shall be approved by the <br /> City before installation by the Contractor. <br /> 2.03 Work Not Included <br /> A. Repairs or replacement of losses and damages not covered by the contract, <br /> except as noted. <br /> B. New planting and other special services, except with City's request or <br /> approval in writing and agreement to pay. <br /> C. Major vandalism or damage caused by natural disasters. <br /> Cemetery Scope of Work 20219-2 rev4 <br /> Rev. 11/29/2021 Page 3 <br />