Laserfiche WebLink
repairs. Contractor shall adjust times to provide necessary water. Multiple <br /> repeat cycles shall be utilized as needed to provide best irrigation efficiency. <br /> F. Repair and replace as necessary, the irrigation system and all its piping from <br /> the backflow prevention device to each of the irrigation heads. It is <br /> understood that throughout the life of the project, incidental replacement of <br /> irrigation heads and risers, quick couplers, valves and piping will be necessary <br /> due to vandalism, vehicle damage, malfunction, and so on. Repair and/or <br /> replacement of all damaged sprinkler heads and riser assemblies, quick <br /> couplers,valves and piping are a part of this contract, and will be paid <br /> for as "Extra Work". Provide receipt for materials as verification for"extra" <br /> reimbursable. If damage occurs due to the contractor, the contractor shall be <br /> responsible for replacing the equipment at their own cost. <br /> G. Maintain in good condition all automatic sprinkler valve boxes and their cover <br /> lids. This includes removal of any plant growth inside of the boxes, and <br /> removing any excessive dirt or debris from inside box so that valve is <br /> completely exposed inside of box. Standing water in the valve boxes shall not <br /> be allowed to remain permanently. <br /> H. All valves should be kept in such condition that they are able to be manually <br /> operated at the box by the air bleed pet-cock. <br /> I. The height of all sprinkler control boxes shall be maintained at approximately <br /> one-half(1/2) inch above the surface of the surrounding grade. <br /> J. Repair and replace all quick coupling valves and lines which are not operating <br /> properly. <br /> K. Repairs to clocks, wiring or necessary system modifications that are outside <br /> the scope of regular irrigation system maintenance shall be the Contractor's <br /> responsibility; however, they are considered as "Extra Work". A cost <br /> estimate shall be provided to the City and such repair shall be approved by the <br /> City prior to initiation. <br /> L. Moisture in soil shall be checked with a soil probe to determine moisture <br /> requirements for all plant areas. <br /> 3.05 Sidewalks, Crush Granite Paths, Off Road Parking and Drive Aisles (Roads) <br /> A. Debris of silt resulting from erosion and other landscape debris, shall be removed <br /> from sidewalks and drive aisles. <br /> B. When necessary the contractor will use water hose to remove silt and mud not <br /> removable by blowers, shovels or brooms <br /> C. Debris caused by vehicles or equipment not related to the Contractor's Service <br /> and Maintenance Operations shall be reported to the city and removed from <br /> sidewalks and drive aisles. <br /> Cemetery Scope of Work 2021 9-2 <br /> rev4 Rev. 5/19/2023 Page 6 <br />