My WebLink
|
Help
|
About
|
Sign Out
6_Exhibit A
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
06-14
>
6_Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2023 12:51:36 PM
Creation date
6/7/2023 12:51:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/14/2023
DESTRUCT DATE
15Y
Document Relationships
6
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\06-14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tentative Map approved by Planning Commission on Feb. <br />22, 2017. Final Map and Improvement Plans approved by <br />City Council on June 18, 2019. Anticipated construction <br />start date is Spring of 2021. Demolition permit submitted <br />to CDD March 2021. Construction started late April 2021. <br />The model home complex was approved in November <br />2021. Construction of homes on individual lots began in <br />Summer 2022. Final inspections on first completed lots <br />began in April 2023. <br />Applicant: GHC Lund Ranch, LLC <br />Staff Contact(s): Eric Luchini <br />10.6455 Owens Dr. Commercial <br />PUD-121, P16-1347, and <br />P16-1349 <br />Application for a PUD development plan to demolish an existing restaurant building at <br />6455 Owens Dr. and construct a single-story multi-tenant commercial building totaling <br />approximately 10,000-square-feet in area. <br />Status Under construction <br />Next Steps/Details:Approved by City Council on December 17, 2019. 2nd <br />read of PUD Ordinance completed January 21, 2020. <br />Applicant submitted for construction permits in May <br />2020. Demolition completed in late Spring 2021. <br />Anticipated completion date is mid-2023. <br />Applicant: Abbas Mash <br />Staff Contact(s): Eric Luchini <br />11. 7200 Johnson Drive Commercial <br />P17-0967 Costco <br />Application for Design Review to construct a new 148,613-square-foot Costco. <br />Status Approved <br />Next Steps/Details:Approved July 2022. Building permits to be issued <br />Summer 2023. <br />Applicant: Costco <br />Staff Contact(s): Eric Luchini <br />12. 7280 Johnson Drive Commercial <br />P18-0068 Two Hotels <br />Application for Design Review to construct two new hotels with 231 rooms and a drive- <br />through coffee shop. <br />Status Under construction <br />Next Steps/Details:Construction began March 2022. Construction anticipated <br />to be completed in Summer 2023.
The URL can be used to link to this page
Your browser does not support the video tag.