near term traffic needs, a decision has been made to <br />proceed with the design, right of way and construction <br />work for the SB direction as the phase 1 of this project. <br />The estimated cost for the SB direction is around $252M. <br />Caltrans has a project in works to pave the existing <br />pavement within approximately the same limits as the <br />express lane. Caltrans has agreed to split their rehab <br />project into NB and SB directions. They plan to move <br />forward with the NB rehab as a stand-alone project which <br />would go to construction in spring 2021. Their SB rehab <br />will be combined with the SB express lane project and <br />will begin construction in Spring 2022. <br />schedule for the combined SB rehab and express lane <br />project: <br />• Design and ROW start – Jan 2020 <br />• Design and ROW completion – October 2021 <br />• CTC allocation of SHOPP and other state funds – Dec <br />2021 <br />• Construction contract advertisement – January 2022 <br />• Construction start – April 2022 <br />• Construction completion – Summer 2025 <br />Applicant: <br />Staff Contact(s): Mike Tassano