My WebLink
|
Help
|
About
|
Sign Out
2_Exhibit B
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
06-14
>
2_Exhibit B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2023 12:51:03 PM
Creation date
6/7/2023 12:50:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/14/2023
DESTRUCT DATE
15Y
Document Relationships
2
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\06-14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PUD-114-01M, 11300 Dublin Canyon Road Planning Commission <br />5 of 15 <br />PROJECT DESCRIPTION <br />The applicant proposes to construct and operate a 9,792-square-foot church and 24,971- <br />square-foot multi-purpose building in multiple phases on a 4.3-acre portion of the site. The <br />church building is proposed to include a sanctuary/nave with seating for up to 358 people as <br />well as a vaulted choir loft. The multi-purpose building would be two-stories and include <br />administration offices, religious education/study rooms, a commercial kitchen, and a <br />gymnasium. As part of the site improvements, the applicant is proposing to construct 121 <br />parking spaces on the subject site. <br /> <br />The Project is proposed to be completed in phases. The first phase (Phase 1) will be to grade <br />the site and prepare the site for construction (utilities, pads, landscaping, hardscaping). The <br />second phase (Phase 2) will be the construction of the 9,792-square-foot church. Phase 1 and <br />2 are anticipated to take between 2-5 years to complete. The third phase (Phase 3) is to be <br />completed in three subphases to construct the 24,971-square-foot multi-purpose building. <br />Phase 3 is anticipated to occur within 5-15 years, with the complete relocation of the <br />existing facility from its current location in Castro Valley within 15 years. <br /> <br />Site Plan and Access <br />The applicant is proposing to subdivide the roughly 16-acre parcel into two parcels (one parcel <br />for the existing church and one parcel for the new Greek Orthodox Church. Figure 2 shows the <br />proposed 4.3-acre portion of the site. The proposed new church parcel will extend from the top <br />of the southern bank of the creek, with the creek and remainder of the site remaining within the <br />existing church parcel. The new church site will be approximately 4.3-acres and will be <br />accessed from two driveways off Dublin Canyon Road, just west of Laurel Creek Drive. The <br />multi-purpose building will be setback approximately 25 feet from the property line along Dublin <br />Canyon Road; however, the two-story portion of the building will be stepped back considerably <br />further, at approximately 87-feet from the property line. <br /> <br />The multi-purpose building will also be setback 35 feet from the adjacent single-family property <br />line to the west, separated by a driveway, and 15-foot landscape buffer. The principal vehicle <br />access for church patrons and guests will be provided by the main central driveway; while the <br />far western driveway will primarily be used as a service entry for garbage pick-up, deliveries, <br />and emergency vehicle access. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.