Laserfiche WebLink
ATTACHMENT 1 <br /> Attachment 1 - PROPOSAL PRICE COMPARISON SUMMARY <br /> WOMACK Striping Chrisp Company <br /> Description of Work Quantity Unit Rate Notes Quantity Unit Rate Notes <br /> Install 30" R1-1 on new post 1 Each 350 1 Each 495 <br /> Install 30"R1-1 on existing post 1 Each 175 1 Each 165 <br /> Install 36"R1-1 on existing post 1 Each 200 1 Each 175 <br /> Install 36"X 48"R2-1 on existing post 1 Each 250 1 Each 195 <br /> Install 30"FYG W11-2 and 24"x 12"FYG W16-7P on new 1 Each 400 1 Each 695 <br /> post <br /> Install 12"x 18" R26A on existing post 1 Each 100 1 Each 115 <br /> Remove 12"x 18"R26A and post 1 Each 150 1 Each 225 <br /> Remove 12"x 18"R26A and leave post 1 Each 50 1 Each 65 <br /> Install 12"x 8"R81 and 12"x 5"R81 B on existing post 1 Each 150 1 Each 115 <br /> Install 30"R1-1 on existing post(signpost extension 1 Each 200 1 Each 395 <br /> needed) <br /> Install 30"R1-1 on street light pole 1 Each 200 1 Each 125 <br /> Install Detail 22 1 LF 4 1 LF 6 <br /> Install 12"white limit line/crosswalk line 1 LF 5 1 LF 8 <br /> Install"STOP"legend 1 Each 250 1 Each 175 <br /> Install"STOP AHEAD"legend 1 Each 500 1 Each 425 <br /> Install Detail 38 1 LF 3 1 LF 5 <br /> Install type IV arrow 1 Each 150 1 Each 125 <br /> Grind centerline(detail 22 or 23) 1 LF 1.5 1 LF 3.5 <br /> Grind lane line 1 LF 1.5 1 LF 2 <br /> Grind type IV arrow 1 Each 150 1 Each 90 <br /> Remove sign/straps but leave post 1 Each 50 1 Each 65 <br /> Remove sign post from dirt 1 Each 150 1 Each 225 <br /> Remove sign post from concrete 1 Each 150 1 Each 350 <br /> Install"25"pavement legend 1 Each 200 1 Each 105 <br /> Install 30"W3-3 on existing post 1 Each 200 1 Each 165 <br /> Green Paint(EF Series Standard Fast Dru Waterbourne Traffic <br /> Paint.Minimum 2 coats for final product to be 12—15 mil 1 SF 3 1 SF 8 <br /> thickness) <br /> Install Endoto K71 Bollard (City will provide bollard and 1 Each 90 1 Each 75 <br /> hardware, contractor to provide resin and tools to install) <br /> Please list if any of the following separate charges exist <br /> Please also list any additional per job charges not listed <br /> (attach additional sheet if needed to explain prices on these items) <br /> Description Quantity Unit Rate Notes Quantity Unit Rate Notes <br /> • <br /> Mobilization 1 EA 500 1 SHIFT 3500 <br /> Traffic Control N/A 1 SHIFT 2200 <br /> Cat-Tracking N/A 1 SHIFT 2800 <br /> USA for new posts N/A 1 EA 35 <br /> Night Work 1000 1 SHIFT 575 <br /> Estimate for Job 1 31,580.00 68,775.00 <br /> Estimate for Job 2 3,135.00 4,925.00 <br />