My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
060623
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2023 4:21:30 PM
Creation date
5/31/2023 4:20:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/6/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
revoke acceptance of such non-conforming waste. In the event of revocation of <br /> acceptance due to waste nonconformity,the City will pay,as applicable, the cost of <br /> transporting to the TSDF,the cost of return transporting from the TSDF to the City's <br /> facility and other reasonable charges including but not limited to handling, loading, <br /> preparing,transporting, storing and caring for, and if applicable,disposal incurred by <br /> the Contractor with the City's Program Manager's written approval. <br /> In the event the Contractor gives the City's Program Manager notice of any <br /> nonconformity, the City of Pleasanton may notify the Contractor of the City's intent to <br /> verify the alleged nonconformity or to correct any correctable nonconformity. The <br /> Contractor will cooperate with and assist the City,at the City's expense,to make such <br /> verification and correction, including conducting additional inspections, taking, and <br /> analyzing additional samples as requested by the City, and making the non-conforming <br /> waste available to the City. <br /> If additional information indicates that the waste material does conform to the list of <br /> wastes provided for the shipment by the City's Program Manager,the Contractor's <br /> notice of non-conformity shall be deemed null, and void and the Contractor shall <br /> reimburse the City for all costs incurred in the verification process. <br /> 8. Measurement and Payment <br /> Services rendered under this Agreement will be measured and paid for in accordance with <br /> the following schedule: <br /> a. Mobilization and Packaging. Mobilization and Packaging will be compensated for on <br /> a time and materials basis in accordance with the Contractor's Emergency & Non- <br /> Emergency Response Rate Sheet contained in Exhibit B. Billable categories under <br /> mobilization and packaging will include personnel hourly charges, daily vehicle <br /> charges (exclusive of waste transportation), equipment charges (personal protective <br /> equipment, pumps, etc.), and packaging material supply charges (containers, <br /> absorbents, labels,etc.) for identification, bulking, loose-packing, and lab-packing. <br /> b. Hazardous Waste Transportation. Hazardous waste transportation for scheduled <br /> routine hazardous waste removal service is included in the Unit Disposal Rates for the <br /> routine waste streams as included in Exhibit B. <br /> c. Hazardous Waste Disposa//Recycling/Destruction. Hazardous waste disposal for <br /> routine waste and miscellaneous streams (as identified in Section E.2. of this <br /> Agreement)will be compensated for at the Unit Disposal Rates included in Exhibit B. <br /> d. 24-hour Emergency Response Services. Emergency response services will be <br /> compensated for on a time and materials basis in accordance with the Contractor's <br /> Emergency & Non-Emergency Response Rate Sheet (Exhibit B). Disposal prices of <br /> hazardous waste that are collected and packaged during emergency response events <br /> will be charged in accordance with Unit Disposal Rates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.