My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
060623
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2023 4:18:44 PM
Creation date
5/31/2023 4:18:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/6/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT DESCRIPTION: (300-word limit) <br /> Please indicate project phase (Planning, PE, ENV, ROW, CON, O&M) <br /> The projects considered for this funding include buffered bike lanes on Stoneridge Drive <br /> between Santa Rita Road and Trevor Parkway, buffered bike lanes and sidewalk/ramp <br /> improvements at 1-580 overcrossings and intersection improvements at various <br /> intersections along Valley Avenue, as recommended through the Bicycle and Pedestrian <br /> Master Plan u•date. <br /> CONTACT INFORMATION <br /> Contact Name &Title: Contact Email: Contact Phone: <br /> Matt Nelson, Assoc. mnelson@cityofpleasantonca.gov 925-931-5671 <br /> Traffic Engineer <br /> Agency: <br /> City of Pleasanton <br /> uired Descnp`ion <br /> 1. Bicycle, Does Project implement relevant ® These projects are <br /> Pedestrian Plans. or other locally adopted provided in the <br /> and Transit recommendations? Pedestrian and Bicycle <br /> Planning Plan examples include Master Plan, adopted in <br /> • City/County General + 2018. The improvements <br /> Area Plans will provide improved <br /> access to all-ages and <br /> • Bicycle, Pedestrian & abilities. <br /> Transit Plan <br /> • Community-Based <br /> Transportation Plan <br /> • ADA Transition Plan <br /> • Station Access Plan <br /> • Short-Range Transit Plan <br /> • Vision Zero/Systematic <br /> Safety Plan <br /> 2. Active ® ❑ The projects will provide <br /> Transportati protected bicycle lanes <br /> on Network Does the project area contain and separated <br /> segments of the regional Active pedestrian/bicycle <br /> Transportation (AT) Network? intersection crossings. <br /> The projects will <br /> [See AT Network map on the decrease the <br /> MTC Complete Streets webpagel intersection crossing <br /> distances for bicycle and <br /> pedestrians as well. <br /> Page 2of7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.