My WebLink
|
Help
|
About
|
Sign Out
5_Exhibit B_Resolution_Attachment 2
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
05-10
>
5_Exhibit B_Resolution_Attachment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2023 3:15:58 PM
Creation date
5/4/2023 3:12:34 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/10/2023
DESTRUCT DATE
15Y
Document Relationships
5
(Superseded by)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\05-10
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />B-24 | City of Pleasanton Sites Inventory and Methodology <br />Table B-11: Existing Uses on Nonvacant Lower Income Sites and Potential Areas for Lower Income <br />Rezoning <br />APN or Area1 Existing Use <br />094 015100806 Multi-tenant offices (law offices), surface parking <br />094 015100805 Multi-tenant office commercial building (CPR training) w. interior parking <br />094 011400700 Restaurant (vacant) <br />094 011400800 Single-family residences (2 units), surface parking lot <br />094 015700104 Commercial buildings (insurance office), surface parking lot <br />094 015700112 <br />Multi-tenant commercial buildings/offices (pizzeria, attorney’s office, brokerage <br />firm, polygraph testing, skin and body care), surface parking lot <br />946 110003902 Furniture store, surface parking lot <br />946 110004000 Furniture store <br />Area 2: Stoneridge Shopping <br />Center Stoneridge Shopping Center, surface parking lots <br />Area 5: Laborer Council Office building and surface parking <br />Area 6: Signature Center Office buildings, parking structures, surface parking lots <br />Area 7: Hacienda Terrace Surface parking2parking3 <br />Area 9: Metro 580 Commercial/Retail (Vacant, Party City) and surface parking3parking4 <br />Area 12: Pimlico Area (North Side) Commercial (car rental, car sales and car wash) and surface parking <br />Area 18: Valley Plaza Multi-tenant commercial center, restaurants, and surface parking <br />1 Details for each individual parcel within each Area are contained in Tables B-14 and B-15. <br />22 The Kaiser Site (APN 941 120105203) had stated interest in redevelopment resulting in inclusion of the site in the <br />4th Cycle Housing Element and no non-residential project proposal having been made in the interim. Approximately 3 <br />acres of the site remain entirely vacant, with the remainder as surface parking. Future housing development may be <br />clustered within a smaller portion of the overall site if Kaiser desires to retain the surface parking and existing solar <br />carports. Current improvements being discussed on this site relate to internal improvements to existing buildings, <br />leaving the remaining portion available for housing. <br />3 Area of parcel to be rezoned for housing is an excess portion of existing surface parking. <br />34 Area of parcel to be rezoned for housing contains a single-story commercial building with two tenant spaces. One <br />of the tenant spaces is vacant, and the other has had frequent tenant turnover, but is currently occupied by Party <br />City. <br />Source: City of Pleasanton, Alameda County Assessor, LWC <br /> <br />As described in Program 1.3, the City is committed to work actively with BART to support the <br />disposition and re-development of the BART-owned property at the Dublin-Pleasanton station. <br />The City has already developed and adopted Objective Design Standards for the BART and <br />other housing sites, and, per Housing Element Program 1.3 will move forward with pre- <br />development planning including re-zoning, completion of a concept plan, public outreach and <br />work with BART to begin to solicit developer interest. Concept planning work is expected to be <br />complete by the end of 2025. Based on review of recent similar partnership projects, <br />subsequent steps and timing would include:
The URL can be used to link to this page
Your browser does not support the video tag.