Laserfiche WebLink
Figure 2- Pleasanton's GHG Target <br /> Pleasanton forecasted Buildings <br /> emissions meeting the <br /> 6 0=: Transportation&Land Use <br /> mPleasanton adopted 2030 emissions <br /> target pathway reduction iMaterials&ConSLImption <br /> CL 4 target wilt <br /> PleasantoNatural Systems <br /> n <br /> Urequire local Y <br /> v 2030 target q <br /> 2 action across Water&Wastewater <br /> sectors. Community Resilience <br /> o <br /> 2017 2030 <br /> DISCUSSION <br /> Attachment 1 provides a summary of all Existing Actions, Primary Actions, and <br /> Secondary Actions with a status update provided for each. Additional details for Primary <br /> and Secondary Actions that have been completed this past year or are in-progress are <br /> provided below. Further, all Existing Actions (i.e., actions that the City was already <br /> undertaking prior to CAP 2.0) have been continued and remain ongoing. Staff provides <br /> specific detail for some Existing Actions that made additional progress this year beyond <br /> their status when CAP 2.0 was adopted. The actions detailed below include: <br /> • Action P1 Reach Codes - Completed <br /> • Action P3 Modify Municipal Code Definition of "Covered Projects"- In progress <br /> • Action P4 Solar and Battery Storage - Completed <br /> • Action S3 Municipal Facilities - In progress <br /> • Action E3 Bicycle and Pedestrian Master Plan and Trails Master Plan - In progress <br /> • Action P5 Zero Emissions Vehicle Infrastructure - Partial completion/in progress <br /> • Action P6 Electrify Municipal Small Engine Equipment - In progress <br /> • Action P7 Electrify Community Small Engine Equipment - In progress <br /> • Action E6 Housing Element Implementation - In progress <br /> • Action P11 Promote LEED Neighborhood Development - Completed <br /> • Action E7 SB 1383 Implementation - In progress <br /> • Action S5 Environmentally Preferable Purchasing Policy - Completed <br /> • Action P13 Urban Forest Master - In progress <br /> • Action P14 Soil Management and Carbon Sequestration - In progress <br /> • Action P15 Water Efficiency and Retrofits - Completed/Ongoing <br /> • Action E18 School Climate Planning - Ongoing <br /> • Action E20 Community Centers - Ongoing <br /> • Action E21 Community Gardens — Ongoing. <br /> Buildings and Energy <br /> • Action P1 Reach Codes [Completed 2022]. The City Council adopted reach <br /> codes (i.e., Building Codes that go beyond the existing codes) on November 1, <br /> 2022, effective with the California Building Code update that went into effect on <br /> January 1, 2023. The new codes generally require new buildings to be all-electric <br /> Page 3 of 9 <br />