My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
050223
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2023 8:22:49 AM
Creation date
4/26/2023 8:22:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/2/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2.Primary CAP 2.0 actions <br /> ActionPrimary Actions <br /> Buildings&Energy:This sector includes strategies to advance the decarbonization of buildings(BE-1),improve energy consumption and efficiency(BE-2),and expand use of <br /> renewable energy(BE-3). <br /> P1.All-electric reach code for new construction Completed.Adopted Nov 1,2022.Effective Jan 1,2023. <br /> P2.Existing Building Electrification Plan - <br /> In-progress.Included as Omnibus item to be reviewed by <br /> P3.Modify Municipal Code definition of"covered projects" Council on March 21,2023. <br /> P4.Solar and storage on"covered projects" Completed.Included as part of the 2023 Building Codes. <br /> Effective Jan 1,2023 and added to CAP checklist. <br /> Transportation&Land Use:This sector includes strategies to advance vehicle clecarbonization(TLU-1),advance active,shared,and public transportation(TLU-2),and advance <br /> sustainable land use(TLU-3). <br /> Partially completed/in-progress.1)As part of P1 Reach <br /> P5.ZEV Infrastructure Plan Codes,required EV Charging for new construction.2) <br /> Created Fleet electrification plan.3)Started work to <br /> install community charging at two locations. <br /> P6.Electrify municipal small engine equipment and reduce emissions of off-road equipment upon replacement In-progress. City pursuing grant and transitioning some <br /> equipment. <br /> P7.Electrify community small engine equipment In-progress.Goal to complete in 2023. <br /> P8.Bicycle amenities - <br /> P9.Bicycle rack incentive program <br /> P10.Increase transit ridership <br /> P11.Promote LEED Neighborhood Development Completed.In 2022,added to CAP checklist for new <br /> develo ment. <br /> Materials&Consumption:This sector includes strategies to increase waste diversion and optimize collection and disposal systems(MC-1),and enhance sustainable production <br /> and reduce consumption(MC-2). <br /> P12.Single use plastic reduction - <br /> Natural Systems:This sector includes a strategy to increase and optimize carbon sequestration and improve ecosystem resilience(NS-1). <br /> P13.Urban Forest Master Plan In-progress.This effort began in 2023 with a goal of <br /> adopting the UFMP in 2024. <br /> In-progress.In 2022,developed 3-year compost <br /> P14.Soil management carbon sequestration projects application plan and particpating in study with <br /> Sto Waste and UC Merced. <br /> improveWater Resources:This sector includes strategies to .. improve <br /> Completed/on-going.In 2022,increased rebade <br /> P15.Water efficiency and retrofits amounts.Will continue to implement program. <br /> 1111 l�111 I!1!111111111 111111111111 ill iiiiiiiii pill1�11111ii i <br /> P16.Comprehensive climate awareness,education,and outreach - <br />
The URL can be used to link to this page
Your browser does not support the video tag.