Laserfiche WebLink
ATTACHMENT 1 <br /> Table 1.Existing ongoing CAP 2.0 actions <br /> Existing Ongoing • Action Status, <br /> Buildings&Energy:This sector includes strategies to advance the clecarbonization of buildings(BE-1),improve energy consumption and efficiency(BE-2),and expand use of <br /> ,renewable <br /> E1.Maintain zero-emissions energy as the default EBCE choice for municipal operations On-going <br /> E2.Maintain zero-emissions energy as the default EBCE choice for the community On-going <br /> Transportation&Land Use:This sector includes strategies to advance vehicle clecarbonization(TLU-1),advance active,shared,and public transportation(TLU-2),and Advance <br /> sustainable land use(TLU-3). <br /> E3.Bicycle&Pedestrian Master Plan and Trails Master Plan In-progress. City continued implementation in 2022. <br /> E4.Regional transit support On-going <br /> E5.Complete Streets implementation In-progress. City continued implementation in 2022 <br /> E6.Housing Element implementation In-progress.6th Cycle(2023-2031)Housing Element <br /> adopted Jan 26,2023.Im lementation be an in 2022. <br /> Materials&Consumption:This sector includes strategies to increase waste diversion and optimize collection and disposal systems(MC-1),and enhance sustainable production <br /> and reduce consumption <br /> E7.SB 1383 implementation In-progress. City continued implementation in 2022. <br /> E8.Outreach and education On-going <br /> E9.Local purchasing On-going <br /> E10.Textile recovery On-going <br /> E11.Pesticide Posting Program On-going <br /> E12.Municipal landscape management practice On-going <br /> El 3.Sustainable land management education On-going <br /> Water Resources:This sector includes strategies to improve water supply&increase conservation(WR-1),and improve stormwater resilience(WR-2). <br /> E14.Controller assistant program On-going <br /> Els.Smart water meter installation On-going <br /> E16.Water Conservation Program On-going <br /> El 7.On-site stormwater management On-going <br /> El 8.School climate action planning On-going. Continued progress in 2022. <br /> El 9.Access to green spaces On-going <br /> E20.Community cooling centers On-going.Centers opened in 2022. <br /> E21.Community gardens On-going.Bernal Community Farm progress in 2022. <br />