My WebLink
|
Help
|
About
|
Sign Out
06C
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
042023 JOINT PUSD
>
06C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2023 1:46:05 PM
Creation date
4/14/2023 1:45:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/20/2023
DESTRUCT DATE
20Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
intersection of Bernal Avenue and First Street / Sunol <br /> Boulevard began in spring 2018. This project expanded <br /> to include entry features, upgrade to the mixed use path on <br /> Sunol Boulevard, resurfacing of Sunol Boulevard and <br /> alteration of all 4 legs of the intersection to provide a <br /> protected intersection for bicycles. 100%plans have been <br /> received and anticipated construction was for fall 2022. <br /> The project is delayed until the summer of 2023 awaiting <br /> PGE relocation of several utility vaults. <br /> • Applicant: City of Pleasanton <br /> • Staff Contact(s): Mike Tassano <br /> REGIONAL PROJECTS <br /> 39. State Route 84 Transportation/Traffic Project <br /> SR 84 <br /> SR 84 from Pigeon Pass to I-680 has completed environmental review and Caltrans <br /> adopted the environmental document in the summer of 2018. Preliminary engineering <br /> and design has started . The design process and right of way acquisition will take <br /> approximately two years with construction to follow in 2021. <br /> Construction of the segment of SR 84 from Pigeon Pass to I-680 will be the final segment <br /> in a series of improvements to widen SR 84 to expressway standards from I-580 in <br /> Livermore to I-680 in Sunol. Environmental review of the SR 84 project began in 2002, <br /> and completion of this final segment will conclude this nearly 20-year project. <br /> • Status Under Construction <br /> • Next Steps/Details: The segment of SR 84 from Pigeon Pass to I-680 has <br /> completed environmental review and Caltrans adopted the <br /> environmental document in 2018. Preliminary <br /> engineering and design is complete and construction <br /> began in April 2021. <br /> Construction of the segment of SR 84 from Pigeon Pass to <br /> I-680 will be the final segment in a series of <br /> improvements to widen SR 84 to expressway standards <br /> from I-580 in Livermore to I-680 in Sunol. <br /> Alameda CTC envisions construction completion in <br /> March/April 2024. <br /> • Applicant: <br /> • Staff Contact(s): Mike Tassano <br /> 40. Valley Link Transportation/Traffic Project <br /> Valley Link <br /> In October 2017 the Governor signed Assembly Bill 758 which created The Tri-Valley— <br /> San Joaquin Valley Regional Rail Authority. This new authority has been created for the <br /> sole purpose of connecting Bart to ACE. The Authority has selected a hybrid powered, <br /> multiple-unit vehicle technology with the ability to convert to fully electric power in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.