My WebLink
|
Help
|
About
|
Sign Out
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2023
>
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2023 9:05:52 AM
Creation date
4/5/2023 8:52:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/21/2023
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Stoneridge Mall Residential Project <br />CEQA Checklist Section 15183 Checklist/15164 Addendum <br /> <br /> <br />52 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480017/Consistency Checklist/21480017 Stoneridge Mall Residential Project Checklist <br />Addendum_Updated.docx <br />Conclusion <br />The proposed project would not result in any aesthetic impacts beyond those considered in the Prior <br />EIR. All impacts continue to be less than significant, and no mitigation is required. <br />The proposed project is consistent with the development evaluated in the certified Prior EIR and <br />would not result in any new impacts or increase the severity of any previously identified impacts as <br />compared to what was already identified and disclosed, either individually or cumulatively. <br />Further environmental analysis is not required because: <br />• No peculiar impacts have been identified as a result of the proposed project or its site. <br />Application of uniformly applied General Plan policies and standards along with <br />regulations of the City of Pleasanton and incorporation of identified project design <br />features will ensure impacts are below the level of significance. <br />• There are no potentially significant impacts that were not analyzed as significant in the <br />Prior EIR. <br />• There are no potentially significant off-site and/or cumulative impacts that were not <br />discussed by the Prior EIR. <br />• No substantial new information has been identified that results in an impact that is more <br />severe than anticipated by the Prior EIR. <br />
The URL can be used to link to this page
Your browser does not support the video tag.