My WebLink
|
Help
|
About
|
Sign Out
RES 231363
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2023
>
RES 231363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2023 9:40:18 AM
Creation date
2/23/2023 9:40:00 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUSTIN BERNAL MOUNTAIN BIKE TRAIL PROJECT DRAFT INITIAL STUDY <br />12956 <br />DUDEK 14 April 2022 <br />Determination (To be completed by the Lead Agency) <br />On the basis of this initial evaluation: <br />I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE <br />DECLARATION will be prepared. <br />I find that although the proposed project could have a significant effect on the environment, there will not <br />be a significant effect in this case because revisions in the project have been made by or agreed to by the <br />project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. <br />I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL <br />IMPACT REPORT is required. <br />I find that the proposed project MAY have a “potentially significant impact” or “potentially significant unless <br />mitigated” impact on the environment, but at least one effect (1) has been adequately analyzed in an earlier <br />document pursuant to applicable legal standards, and (2) has been addressed by mitigation measures <br />based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is <br />required, but it must analyze only the effects that remain to be addressed. <br />I find that although the proposed project could have a significant effect on the environment, because all <br />potentially significant effects (a) have been analyzed adequately in an earlier ENVIRONMENTAL IMPACT <br />REPORT or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or <br />mitigated pursuant to that earlier ENVIRONMENTAL IMPACT REPORT or NEGATIVE DECLARATION, including <br />revisions or mitigation measures that are imposed upon the proposed project, nothing further is required. <br />Matt Gruber, City Landscape Architect; Engineering Department Date
The URL can be used to link to this page
Your browser does not support the video tag.