My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit A
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:06:43 PM
Creation date
2/16/2023 1:06:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-2023-06 <br />Page Thirty-Three <br /> <br /> <br />inspection by the Landscape Architecture Division. Removal of such fencing prior to approval <br />may result in a “stop work order.” <br /> <br />OPERATIONS SERVICES DEPARTMENT – ENVIRONMENTAL SERVICES/UTILITIES DIVISION – <br />925-931-5500 <br /> <br />126. SEWER LINE: The sewer line shall be private from the new manhole on Stoneridge Mall Road <br />into the development. Prior to building permit submittal, the project plans shall be revised to <br />reflect this requirement. <br /> <br />127. BACKFLOW PREVENTION ASSEMBLIES: Backflow preventer assemblies shall be designed <br />and installed in accordance with current City Standards 704, 705, 706; State Health and Safety <br />Code; Title 17; and as required by the Director of Operations and Water Utilities. All backflow <br />preventer assemblies shall be tested and certified by a City approved tester with the certification <br />submitted to the City’s contractor, Aqua Backflow. Testing will be performed at the time City water <br />is turned on to the site. If an existing backflow preventer is on the site it shall be tested and <br />certified by an approved tester with the certification submitted to the City’s contractor, Aqua <br />Backflow, before project water is drawn through it. An all-weather cover shall be placed over all <br />backflow prevention assemblies approximately four inches and smaller. <br /> <br />128. FOG PROGRAM: All new food service establishments (FSEs) and all existing food service <br />establishments with a building permit valuation of $50,000 or more shall obtain a wastewater <br />discharge permit from the Director of Operations and Water Utilities and comply with the grease <br />interceptor requirements as set forth in PMC Section 15.44. All other FSEs shall at a minimum <br />comply with the grease trap and wastewater discharge permit requirements as set forth in PMC <br />Section 15.44. (Note to author: only applicable for restaurant and food uses – delete if not used.) <br /> <br />129. RECYCLED WATER: Recycled water should be used on site during the grading and construction <br />period. However, under any declared stage of water shortage, recycled water must be used <br />throughout the grading and construction period. <br /> <br />130. RECYCLED WATER USE REQUIREMENT: If the site is within the city’s recycled water service <br />area (recycled water distribution system is along route to the proposed application), the irrigation <br />system must be designed in accordance with the City’s Recycled Water Use Guidelines and <br />Recycled Water Irrigation Standards, per PMC Section 14.06. Refer to PMC Section 14.20 for a <br />list of exceptions. <br /> <br />131. RECYCLED WATER USE PERMIT: The applicant shall submit a Recycled Water Use Permit <br />application and package (as outlined in the City’s Recycled Water Use Guidelines available <br />online), to the Recycled Water Program (925-931-5513). The Recycled Water Use Permit <br />application and package shall be submitted concurrently with the building permit submittal, and <br />shall be conditionally approved by the Recycled Water Program prior to building permit issuance. <br />Final approval by the Recycled Water Program is required before the start of recycled water <br />service. Refer to PMC Section 14.06 for the regulations of recycled water use. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.