My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit A
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:06:43 PM
Creation date
2/16/2023 1:06:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-2023-06 <br />Page Twenty-Six <br /> <br /> <br />recommendations, or designed by a registered professional engineer and installed according to <br />approved plans. No excavation shall be performed atop or adjacent to a high-risk facility until <br />authorized by the owner of the facility. High-risk facilities are defined as gas transmission <br />pipelines and hazardous liquid pipelines as regulated by the U.S. Department of Transportation <br />Pipeline and Hazardous Materials Safety Administration (US DOT PHMSA) (Address this <br />condition during construction) <br /> <br />81. POLLUTANT REDUCTION IN STORMWATER: At no time during construction of the project <br />shall pollutants be allowed to enter, clog, or contaminate storm drain pipe networks or open <br />stormwater channels in violation of Pleasanton Municipal Code §9.14.080 et seq. The applicant <br />shall contain all trash and debris for proper disposal to authorized landfills or recyclers. Erosion <br />control features shall be deployed during the rainy season that extends from October 1 to April 15 <br />each year, or any time rain is forecast outside of this period. Best Management Practices (BMPs) <br />shall be strictly followed. Street sweepers must be employed if soil or debris is tracked onto the <br />public roads from vehicles exiting the site. Standard BMPs are available from the California <br />Stormwater Quality Association (CASQA), the United States Environmental Protection Agency <br />(EPA), Caltrans, and others. Notes and/or illustrations shall be added to the plans that describe <br />the BMPs to be utilized during construction. The use of manufactured erosion control woven <br />blankets and straw wattles that utilize plastic monofilament netting is specifically prohibited. <br />(Address this condition during construction) <br /> <br />82. SWPPP REPORTING: Copies of any monitoring and/or sampling reports required by the <br />stormwater pollution prevention plan (SWPPP) and submitted by the Legally Responsible Person <br />(LRP) to the State of California’s SMARTS database shall also be submitted to the City of <br />Pleasanton inspector assigned to the project. The LRP shall also submit to the City a copy of the <br />required Annual Report no later than September 1 of each year that construction is active or <br />when erosion control features have been deployed. The report must include a summary of all <br />sampling and analysis performed (Risk Levels 2 and 3 only), a log of all inspections performed <br />including Rain Event Action Plans (REAP), a summary of any required corrective actions taken, <br />and a summary of any violations. (Address this condition during construction) <br /> <br />83. DUST CONTROL: Dust control measures must be employed during all phases of construction to <br />prevent airborne nuisance to neighboring properties. All stockpiles or unused materials that can <br />create dust shall be covered or removed. Exposed soil areas shall be routinely watered until <br />surfacing materials or landscaping is installed. Use of dust palliatives shall conform to Caltrans <br />Standard Specification Section 18. Any damage caused by airborne dust to neighboring <br />properties shall be cleaned with costs paid by the applicant. If the applicant fails the address dust <br />as directed by the City, the City shall have the right to enter the property to effectuate the <br />correction, with all costs paid by the applicant or levied as a lien against the applicant’s property. <br />(Address this condition during construction) <br /> <br />84. PROPERTY NUISANCE: At no time during construction of the project shall the condition of the <br />property become a nuisance as defined in Pleasanton Municipal Code §9.28.020. The City shall <br />have the right to inspect the property for conditions that violate the code standard. If a nuisance is <br />found, the applicant shall immediately submit a plan of correction. Depending on the severity of <br />the nuisance, the City may suspend all construction work until the condition is corrected. Any of <br />the following conditions shall be considered severe: Leaking chemicals that can cause <br />environmental damage; open excavations or any excavation deeper than approximately four feet <br />that lacks proper shoring; unsecured materials that can fall to the ground causing damage or <br />injury; open or exposed utilities that could cause electrical shock or contamination of sewer, <br />potable water systems, groundwater wells, or storm drainage networks. If the applicant fails the
The URL can be used to link to this page
Your browser does not support the video tag.