My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
020723
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 1:30:11 PM
Creation date
2/2/2023 1:30:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/7/2023
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.05 Debris Control <br /> The property shall be reviewed weekly to ensure that debris such as bottles, papers, <br /> cartons and similar items are disposed of to keep the grounds neat in appearance. <br /> SECTION 5. ORNAMENTATION AND GROUND COVER <br /> 5.01 General <br /> The Contractor shall maintain all ground cover, including hard fescue areas, on the <br /> site(s) covered by this agreement in a healthy, thriving condition by performing the <br /> following operations and other work incidental thereto: <br /> 5.02 Weed Control <br /> Eliminate weeds, including undesirable grasses such as tall fescue, nut grass, rye, etc., <br /> preferably with IPM techniques, but also with pre-emergent herbicides and/or selective <br /> systematic herbicides. Hoe weeds as little as possible since this may result in plant <br /> damage. Hand-pull weeds that are not effectively controlled by chemical herbicides. <br /> A. All planting beds and graveled areas shall be kept weed free. <br /> B. All debris resulting from weeding operations shall be removed from the <br /> project area on the same day that the weeding operation occurs. <br /> C. Should the Contractor desire to use a chemical weed control program, he <br /> shall develop said program and submit it in writing as part of this bid. The <br /> City shall be notified at least seven (7) days before each use. Credit for <br /> herbicide application (pre and post emergents) will only be given when <br /> Contractor notifies the City prior to said application. <br /> D. All tree wells are to be kept weed and grass free for an area extending out a <br /> minimum of 2.5' from the trunk of the tree in any direction. (See also Section <br /> 6.05 under Tree and Shrub Care.) A three inch layer of organic mulch should <br /> be maintained in the tree wells. Care should be taken to pull mulch away from <br /> the trunk of the tree a minimum of two inches. <br /> 5.03 Ground Cover Areas <br /> All ornamental plant material and ground covers shall be judiciously pruned maintaining <br /> the natural structure of the plant. All vegetation shall be maintained and clear of all <br /> walkways. Perform edging so that groundcover "feathers back" from border of <br /> groundcover area, forming a natural appearance; do not shear or create vertical edges. <br /> 5.04 Watering <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.