Laserfiche WebLink
STONERIDGE MALL REDEVELOPMENT | <br />PLEASANTON, CA | DECEMBER 2022 <br />STONERIDGE FRAMEWORK COMPONENTS - CIRCULATION AND OPEN SPACE CONCEPTS <br />0 300’150’ <br />N <br /> NOTE: LOCATIONS OF COMPONENTS SHOWN IN THIS <br />DIAGRAM ARE ILLUSTRATIVE/CONCEPTUAL ONLY AND WILL <br />BE REFINED THROUGH SUBSEQUENT FRAMEWORK PROCESS. <br />STREET DRIVE <br />LEGEND <br />PLAZA OPEN SPACES <br />GREEN AND PLAZA OPEN SPACES <br />GRADE CHANGE <br />STAIR OR VEHICULE CONNECTION <br />PERIMETER N.V. PATH AND CONNECTIONS <br />TO MALL <br />PEDESTIRAN WALKWAYS <br />PEDESTIRAN CONNECTIONS <br />MIXED RETAIL AND ACTIVE USES <br />STONERIDGE MALL RD GENOMICS PIEMBARCADERO CTSTONERIDGE MALL RD STONERIDGE DRDEODAR WAYFOOTHILL RDARTHUR H. BREED, JR FWY (580)LAUREL CREEK WAYBART <br />PARKING <br />SPRINGDALE AVE <br />JP PENNEY <br />NORDSTROM <br />(VACANT) <br />SEARS <br />(VACANT) <br />MACY’S <br />MEN’S <br />MACY’S <br />WOMEN’S <br />STONERIDGE <br />SHOPPING <br />CENTER <br />CA <br />N <br />Y <br />O <br />N <br /> <br />W <br />A <br />Y <br />FIGURE 2