My WebLink
|
Help
|
About
|
Sign Out
01 ATTACHMENT 1
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
012623 SPECIAL
>
01 ATTACHMENT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 5:34:03 PM
Creation date
1/20/2023 5:33:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/26/2023
DESTRUCT DATE
15Y
Document Relationships
01
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2023\012623 SPECIAL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />13 <br /> <br />of the site(s), generally at locations shown on the conceptual Circulation Plan. <br />New streets or drives should be aligned with existing roads and intersections <br />whenever possible, and pedestrian crossings provided at all intersections. <br />• As properties redevelop, the current pattern of numerous parking lot drive aisles <br />that connect directly to Stoneridge Mall road should be eliminated or significantly <br />reduced, so that vehicles connect from parking lots to Stoneridge Mall Road, via <br />a smaller number of formalized roads/drives and intersections. This change will <br />allow for continuous curb, gutter and sidewalk/multi-use path around the <br />perimeter of the mall, with a reduction in vehicle access points and a reduced <br />potential for vehicle conflicts. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Stoneridge Mall Road: Conceptual Street Section and Rendering
The URL can be used to link to this page
Your browser does not support the video tag.