Laserfiche WebLink
City of Pleasanton <br />City of Pleasanton 2023-2031 (6th Cycle) Housing Element Update Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 10 <br />C:\Users\mramirez\ADEC Solutions USA, Inc\Publications Site - Documents\Publications\Client (PN-JN)\2148\21480022\MMRP\21480022 Pleasanton Housing Element Update MMRP.docx <br />Mitigation Measures Method of Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />• The project application shall relocate the proposed <br />mechanical system further from property line to reduce <br />operational noise levels to not exceed the City’s noise <br />performance standards as measured at the property line. <br />MM NOI-2: Construction Vibration Reduction Plan <br />For any future development projects that would use pile- <br />driving within 200 feet of an off-site structure, prior to the <br />issuance of grading permits for a project, the project sponsor <br />shall retain a Noise Specialist to prepare a Construction <br />Vibration Reduction Plan for submittal to the City’s Planning <br />Director for review and approval that identifies specific <br />techniques, such as the depth and location of temporary <br />trenching, that would reduce potential vibration impacts to <br />less than significant for any impacted structures. Upon <br />approval by the City, the construction vibration reduction <br />measures shall be incorporated into the construction <br />documents. A note shall be provided on grading and building <br />plans indicating that, during grading and construction, the <br />property owner/developer shall be responsible for requiring <br />contractors, to be monitored via on-site inspection by the <br />Community Development Department, to implement these <br />measures to limit construction-related vibration impacts. <br /> <br />For any future development projects that would necessitate <br />the use of large vibratory rollers within 30 feet of an off-site <br />structure, or the use of heavy construction equipment (i.e., <br />construction equipment with a PPV at 25 feet [inches per <br />second] rating of 0.051 or greater as shown in Table 3.11-3 in <br />Section 3.11, Noise, in this Program EIR) within 15 feet of an <br />off-site structure, the project sponsor shall retain a Noise <br />Specialist to prepare a Construction Vibration Reduction Plan <br />for submittal to the City’s Director of Community Development <br />for review and approval that identifies specific techniques, <br />such as the depth and location of temporary trenching, that <br />Submittal and approval of <br />final site-specific project- <br />level construction <br />vibration reduction plan, <br />when applicable, and <br />incorporation of measures <br />into construction <br />documents; <br />implementation of <br />construction vibration <br />reduction plan <br />During construction <br />and prior to the <br />issuance of grading <br />permits for a project <br />City of Pleasanton <br />Community <br />Development <br />Department, Building <br />& Safety Inspection <br />Division <br />