Laserfiche WebLink
and Recreation Commission did not recommend adding the shade canopies for both <br /> reasons noted. Benches for the playground will be provided at a later date due to <br /> funding availability and the lead time on the benches. <br /> The professional services agreement with Miracle Playsystems, Inc. totals $324,608.24, <br /> which includes the final design per public input, fabrication and installation of the play <br /> equipment, and associated engineered wood fiber installation. Staff recommends City <br /> Council approve the agreement with Miracle Playsystems, Inc. If approved, <br /> the equipment will be fabricated, then installed in late spring or summer 2023. <br /> Submitted by: Fiscal Review: Approved by: <br /> lAr <br /> Stephenikpatrick Susan Hsieh Gerry Beaudin <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1. Estimated Funding and Project Expenditures <br /> 2. Contract <br /> 3. Final Conceptual Design Renderings <br /> Page 4 of 4 <br />