Laserfiche WebLink
<br />Sites Inventory and Methodology City of Pleasanton | B-9 <br />This analysis also included an evaluation of environmental and infrastructure constraints, which <br />are described in Appendix C, Section C.4. All identified sites have access to infrastructure and <br />utilities. Given implementation of the programs in the Housing Element (particularly Programs <br />4.4 and 4.5), there are no environmental or infrastructure constraints to the development of <br />identified sites in the sites inventory. <br />Furthermore, some sites that were screened out of the results (e.g., buildings built after 1980) <br />were determined to be suitable housing sites based on property owner or developer interest or <br />other firsthand experience from City staff. Those sites were added to the inventory with the <br />appropriate income categorization based on allowed density and parcel size. <br />Phase 5: Rezone Sites Selection <br />The preliminary evaluation of existing residential capacity showed the need to identify <br />additional sites to accommodate the RHNA. The City solicited statements of interest from those <br />interested in requesting specific sites or properties be evaluated for inclusion as a rezone site. <br />Based on statements of interest and local knowledge, the City prepared an initial list of potential <br />rezone areas/parcels. These potential areas/parcels were evaluated based on criteria <br />reviewed by the Housing Commission and Planning Commission and approved by the City <br />Council. Criteria included proximity to transit, California Tax Credit Allocation Committee <br />criteria, readiness and suitability for housing (e.g., site size, availability of infrastructure, <br />absence of environmental and other constraints), among others. The potential rezone <br />areas/parcels and associated evaluation were presented and discussed at a Community <br />Meeting and with the Housing Commission, Planning Commission, and City Council. The City <br />Council considered input from the public and Commission before approving the rezone <br />areas/parcels for inclusion in the Housing Element. After potential rezone sites were analyzed <br />pursuant to the California Environmental Quality Act (CEQA) and further evaluated through <br />public meetings, and in response to public comments and discussions with the California <br />Department of Housing and Community Development (HCD), the sites were narrowed to those <br />found to be most suitable for housing development based on environmental impact, property <br />owner interest, likelihood of development, and affirmatively furthering fair housing (see <br />Appendix F). <br />Realistic capacity for lower income rezone parcels is based on the proposed minimum density, <br />whereas realistic capacity for moderate and above moderate income rezone parcels is based <br />on the average of proposed minimum and maximum density. These densities are consistent <br />with development trends in Pleasanton and the Tri-Valley (see Sections B.2.3 and B.2.5). <br />Phase 6: Parcels in Prior Housing Elements <br />Vacant parcels from both the 4th and 5th Cycles and non-vacant parcels from the 5th Cycle can <br />be reused in this Housing Element (the 6th Cycle) to accommodate lower-income housing, but <br />they must be rezoned to allow projects with at least 20 percent of the units affordable to lower <br />income households to be by-right. Figures and tables in Sections B.3.2 and B.3.3 show all 6th