My WebLink
|
Help
|
About
|
Sign Out
21 ATTACHMENT 7
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
122022
>
21 ATTACHMENT 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 12:49:57 PM
Creation date
12/16/2022 11:49:43 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/20/2022
DESTRUCT DATE
15Y
Document Relationships
21
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\122022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meghan Campbell � FA R E L LA <br /> November 30, 2022 BRAUN+MARTEL LLP <br /> Page 5 <br /> residential development on 10 acres of the parking lot. But by the time that the 2015-2023 <br /> Housing Element was adopted, its commitment to do so was already in doubt. The 2015 <br /> Housing Element2 explained that Simon now had begun exploring further retail expansion <br /> including on the ten acres, and that therefore the City staff's"estimate of potentially developable <br /> area"was only 2.2 acres: "[S]taff has reduced the area available for high-density residential to <br /> 2.2 acres to accurately reflect potential development." 2015 Housing Element at pp. 67, 70. The <br /> 2015 Housing Element also acknowledged that the site would require new sewer pipelines as <br /> well as upsizing of existing pipelines to accommodate the additional demand, at a cost of <br /> "between a few hundred thousand to several [sic] hundred thousand dollars." Id. at 63. <br /> Since 2015, when staff concluded that only 2.2 of the 10 acres rezoned "accurately reflect <br /> potential development,"the owner has become no clearer or urgent about plans for residential <br /> development. Simon applied for and obtained Design Review approval (P18-0340) for a <br /> significant commercial expansionansion in 2019,to demolish the existing Sears Department store and <br /> construct up to 255,420 square feet(79,269 square feet increase)of new retail, cinema, specialty, <br /> and health club facility uses. It submitted a plan in August 2019 to construct 486 apartment units <br /> and a parking structure, but after a Planning Commission workshop in March 2020, the project <br /> languished; a new proposed project was submitted two years later, in late March 2022 it <br /> apparently proposed 360 units instead,which has been"under staff review" in the eight months <br /> since. There is very little public information available about the proposal, and no indication that <br /> it includes affordable housing. <br /> Eight years later, the hope that the two odd-shaped portions of the parking lot will <br /> become affordable housing can no longer reasonably be considered"likely." The City lacks <br /> substantial evidence that the existing use—as a parking lot for the adjacent mall—will"likely" <br /> cease during the next eight years. To the extent that the proposal for the 360 units is considered, <br /> this shows that the site will not be used for housing affordable for lower income residents. <br /> B. The Five New Parcels Proposed To Be Rezoned. <br /> The other five parcels listed have even less indication that they are likely to become <br /> housing in the next eight years. While there have been general expressions of interest in creating <br /> a new neighborhood to complement the existing retail uses, none of the owners(e.g., Macy's) <br /> have applied to redevelop their property as residential, made plans to relocate, or sold to a <br /> residential developer. The existing leases also likely provide for continued parking rights, which <br /> would be an obstacle to development during the eight years. The parcel map also shows that the <br /> parcels listed on the draft Housing Element cover not just the parking lot, but portions of the <br /> retail mall building itself. <br /> The draft Housing Element is itself internally inconsistent about how much housing is <br /> realistic here. Notably, staff acknowledges that"there are approximately 18 acres within the <br /> current surface parking lots that could realistically develop with high density residential <br /> 2HAC Appendix Tab 8. <br />
The URL can be used to link to this page
Your browser does not support the video tag.