My WebLink
|
Help
|
About
|
Sign Out
21 ATTACHMENT 4
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
122022
>
21 ATTACHMENT 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 12:48:43 PM
Creation date
12/16/2022 11:39:27 AM
Metadata
Fields
Template:
CITY CLERK
Document Relationships
21
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\122022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 8: EPAP Plus Project and EPAP Plus Project Plus Extension Conditions 95th <br /> Percentile Turn Pocket Queue Summary at Signalized Intersections <br /> EPAP Plus <br /> Storage EPAP EPAP Plus Project <br /> Intersection Movement Length Peak Hour Queue Project Plus <br /> (ft)' Length(ft) Queue Extension <br /> Length(ft) Queue <br /> Length(ft) <br /> 6 Foothill Rd&Bernal Ave SBL 300 PM 300 325 300 <br /> 13 Santa Rita Rd & SBL 325 PM 325 400 325 <br /> Stoneridge Dr <br /> 21 Santa Rita Rd &1-580 SBL 425 PM 425 425 450 <br /> EB/Pimlico Dr <br /> AM 50 175 150 <br /> EBL 100 <br /> Santa Rita Rd&Old PM 100 150 150 <br /> 23 Santa Rita Rd/Pickens Ln <br /> AM 150 300 300 <br /> NBL 250 <br /> PM 100 500 425 <br /> 24 Santa Rita Rd&Valley EBL 200 AM 200 200 225 <br /> Ave PM 250 250 325 <br /> Notes: <br /> 1. An additional 60 to 90 feet of storage is typically provided in the taper area outside of the through lane,which is <br /> not reflected in the storage length above. <br /> 2. Bold indicates queue potentially extends beyond available storage. <br /> Source:Fehr&Peers,December 2022. <br /> EPAP Conditions Intersection Improvement Measures <br /> Potential improvement measures were developed for intersections operating below the city's LOS <br /> standards under any of the EPAP conditions' scenarios. Those potential improvement measures <br /> are as follows: <br /> • Intersection 13:Santa Rita Road/Stoneridge Road—The addition of project generated <br /> traffic to EPAP baseline conditions would result in this intersection degrading from LOS D <br /> to LOS E during the AM peak hour and increasing delay in PM peak hour under EPAP Plus <br /> Project Conditions. Under EPAP Plus Project Plus Extension Conditions,the intersection <br /> would operate at LOS E with lower delay in the AM peak hour and operate at an <br /> acceptable LOS D in the PM peak hour. Further mitigation was not identified due to the <br /> widening required and the presence of adjacent land uses abutting the roadway. <br /> • Intersection 16:Hopyard Road/Owens Drive—This intersection would operate at LOS E <br /> during the PM peak hour under EPAP, EPAP Plus Project and EPAP Plus Project Plus <br /> Extension conditions. This is an exempt intersection with LOS below the City of <br />
The URL can be used to link to this page
Your browser does not support the video tag.