Laserfiche WebLink
r. <br /> Operations at this intersection can be improved to LOS D by optimizing the traffic signal <br /> timing to adjust for forecast changes in PM peak hour volumes. <br /> • Intersection 24:Santa Rita Road& Valley Avenue—This intersection is projected to <br /> operate at a deficient LOS F during the PM peak hour under Existing and Existing Plus <br /> Project Conditions.The City's Traffic Impact Fee program identifies two modifications to <br /> this intersection:the addition of a third southbound left turn lane and the addition of a <br /> second westbound left turn lane.These two improvements along with signal timing <br /> adjustments bring the Existing conditions intersection LOS to an acceptable level.The <br /> addition of the Project drops this improved intersection below an acceptable LOS, with <br /> the TIF improvements included. <br /> • Intersection 32:Sunol Boulevard&1-680 Southbound—This intersection is projected to <br /> operate at a deficient LOS F (southbound approach at this unsignalized intersection) <br /> during the PM peak hour under Existing Plus Project conditions. The installation of a <br /> traffic signal at this location would result in acceptable operations.The installation of a <br /> traffic signal at the intersection is planned, and that installation is reflected in subsequent <br /> analyses of EPAP and Cumulative baseline conditions. <br />