Laserfiche WebLink
Ell <br /> Intersection Control' <br /> Peak Existing Existing Plus Project <br /> Hour2 Delay3 LOS Delay3 LOS <br /> AM 14.2 B 20.8 C <br /> 26 Valley Avenue/Busch Road Signal PM <br /> 7.1 A 11.3 B <br /> Bernal Avenue/Valley AM 41.8 D 44.3 D <br /> 27 Avenue/Stanley Boulevard Signal PM 37.0 D 39.4 D <br /> 28 Stanley Boulevard/EI Charro Signal AM - - - - <br /> Road PM - - - - <br /> Sunol Boulevard/First AM 42.2 D 45.9 D <br /> 29 Street/Bernal Avenue Signal PM 36.5 D 40.6 D <br /> Sunol Boulevard/Valley AM 36.4 D 42.9 D <br /> 30 Avenue/Junipero Street Signal PM 23.2 C 26.6 C <br /> 31 Sunol Boulevard/I-680 NB SSSC AM 1.5(8.2) A(A) 1.6(8.7) A(A) <br /> Ramp PM 5.3 (12.3) A(B) 6.9(18.2) A(C) <br /> 32 Sunol Boulevard/I-680 SB SSSC AM 3.9(29.5) A(D) 4.3 (34.6) A(D) <br /> Ramp PM 5.7(31.4) A(D) 20.3(91.2) C(F) <br /> Notes: <br /> 1. Existing intersection traffic control type,(SSSC= Side-Street Stop-Controlled;Signal =Signalized) <br /> 2. AM=Weekday morning peak hour, PM =Weekday evening peak hour <br /> 3. Whole intersection average delay reported for signalized and all-way stop-controlled intersections.Side-Street <br /> stop-controlled delay presented as Whole Intersection Average Delay(Worst Movement Delay).Delay <br /> calculated per HCM 2000 methodologies. <br /> Bold indicates LOS below the City of Pleasanton standard. <br /> Bold and italics indicates exempt intersections with LOS below the City of Pleasanton standard. <br /> Source:Fehr&Peers,December 2022. <br /> Vehicle Queues <br /> The addition of Project traffic is expected to cause queues to exceed the existing length of a left <br /> turn pocket or make a through movement block access to a left turn pocket for the movements <br /> shown in Table 6. It should be noted that Table 6 only reports new queues exceeding the <br /> available storage with the addition of Project traffic.Appendix B provides a complete summary of <br /> intersection queuing, including those locations wherein the storage is already exceeded in <br /> existing conditions prior to the addition of project generated traffic. <br />