My WebLink
|
Help
|
About
|
Sign Out
3_Exhibits A-G
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2022
>
12-14
>
3_Exhibits A-G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2022 2:54:28 PM
Creation date
12/7/2022 2:52:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/14/2022
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2022\12-14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT Redlines <br />Housing Element Section 4B <br />Program 4.3 <br />Suspend enforcement of the Growth Management Program and Ordinance (Pleasanton <br />Municipal Code 17.36) as necessary to comply with state law, specifically the Housing Crisis Act <br />(SB 330). <br />• Responsible Agency: Planning Division, City Manager <br />• Time Period: Ongoing <br />• Funding Source: Planning Division Budget <br /> <br />Program 4.4 <br />Develop and update plans and programs to identify and address infrastructure deficiencies, <br />including funding mechanisms for infrastructure improvements necessary to accommodate the <br />planned and projected growth identified in the General Plan and to accommodate the 6th Cycle <br />RHNA. These efforts will include the following: <br />1. Conduct a sewer/wastewater capacity analysis to ensure future sewer infrastructure <br />needs, including sewer infrastructure upgrades and facilities to accommodate the 6th <br />Cycle RHNA, and on the basis of that study, identify and prioritize capital improvement <br />projects and funding needs. <br />2. Adopt written policies and procedures that grant priority for sewer hookups for <br />residential development that helps meet Pleasanton’s share of the regional need for <br />lower-income housing, consistent with Government Code §65589.7. <br />3. Continue to assess and plan for adequate water supply and infrastructure, including <br />completion of groundwater treatment improvements to address known contaminants <br />in City-operated wells; completion of water supply and operational plan updates, <br />undertaking required updates to the City’s Urban Water Management Plan; working <br />with water suppliers including Zone 7 to ensure adequate supplies; and <br />implementation of the City’s recycled water and water conservation programs (see <br />Program XX, below). <br />4. Identify funding mechanisms for infrastructure improvements contained in the General <br />Plan to accommodate projected housing growth. The City will continue to make <br />infrastructure improvements on an as-needed basis, and based on the priorities <br />established in the above-referenced water and sewer capacity and needs <br />assessments, to accommodate existing and planned growth, typically funded through <br />the Capital Improvement Program (CIP), in turn funded by the General Fund and <br />developer impact fees and connection fees. <br />• Responsible Agency: Operation Services Department, Planning Division <br />• Time Period: Complete a sewer/wastewater capacity analysis and adopt written policies <br />and procedures that grant sewer hookups priority (September 2023); review Capital
The URL can be used to link to this page
Your browser does not support the video tag.