My WebLink
|
Help
|
About
|
Sign Out
CC MIN 05312022
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2020 - PRESENT
>
2022
>
CC MIN 05312022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2022 4:59:58 PM
Creation date
11/2/2022 4:59:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
5/31/2022
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
returning those funds to the CIP. She confirmed the Rainy Day Fund currently sits at 30% but will be <br /> reduced once funds move out of the General Fund and back to CIP. She noted at no point will it fall <br /> below the target fund balance. <br /> Councilmember Testa inquired why there is a Reserve and a Rainy Day Fund. Interim Finance Director <br /> Shah explained a reserve is good fiscal practice and allows the City time to plan and react in worst- <br /> case scenarios. She noted reserve policies will be found in almost any financial institution that manages <br /> its funds appropriately. She explained the Rainy Day Fund was the City Council and staffs way of <br /> mitigating the unknown of the pandemic. <br /> Councilmember Narum inquired if there is a cost-saving by combining the Library roof repairs and the <br /> fire control panel work. Director Kirkpatrick advised there would be no cost savings as they are different <br /> types of work. He acknowledged the fire panel is old and needs to be replaced. He reported he has <br /> discussed the issue with the Fire Marshal and the only reason to replace the fire panel is its age. <br /> Councilmember Narum inquired about funding sources for the West Las Positas Boulevard repair. <br /> Director Kirkpatrick reported a geotechnical study was recently conducted and the recommendation <br /> from the report is that there will be isolated areas for repair. Interim City Manager Dolan explained the <br /> funding source is pulled from several areas, although City Traffic Engineer Tassano believes grant <br /> funding can be found. It will fall back to the General Fund if other sources cannot be identified. <br /> Councilmember Narum inquired if the information from the study will be positive for reducing funding. <br /> Director Kirkpatrick advised he believes it is but noted no one could have predicted the increase in oil <br /> which has resulted in bids coming in significantly higher. <br /> Councilmember Narum inquired if Director Kirkpatrick was comfortable with the funding for the widening <br /> of Bernal Avenue at First Street. Director Kirkpatrick explained staff has received estimates that show <br /> the funding is adequate but with the cost of asphalt going up and Pacific Gas & Electric (PG&E) <br /> needing to remove their vaults for the City to widen the street, it has been delayed and may cost more <br /> with time. He noted there is some contingency. <br /> Councilmember Narum inquired about the balance of the Repair & Replacement Fund at the beginning <br /> of the fiscal year and the projected ending balance. Interim Finance Director Shah reported the fund <br /> started with $19 million and $19.5 million projected. She advised staff is anticipating another $3 million <br /> in revenues to that fund balance. She reported the expenses are approximately $8.2 million with a <br /> projected ending fund balance of$14.6 million. <br /> Councilmember Narum inquired what the average balance of that fund has been over the last five <br /> years. Interim Finance Director Shah reported the average fund balance for the last five years was $23 <br /> million. She confirmed the City is drawing down on the fund in this proposed budget. She further <br /> advised there is an increase in need due to deferment of expenses. She clarified the fund balance is <br /> decreasing by $9 million from where it has typically been over the last five years. <br /> Councilmember Arkin inquired about Planned Unit Development (PUD) fees and if it has ever been <br /> determined if it covers the full cost of staff time. She noted that it seems like there is a big variance in <br /> certain projects in terms of staff time required. Interim City Manager Dolan reported the City conducted <br /> a fee study and updated the fees recently. Community Development Director Ellen Clark confirmed <br /> there is a wide range of staff time from simple PUDs to more complicated ones. She advised the fee <br /> attempts to strike a balance. <br /> Councilmember Arkin inquired if the 30.7% Operating Budget threshold was referencing the General <br /> Fund Reserve. Interim Finance Director Shah clarified the threshold is a combination of both the Rainy <br /> Day Fund and the General Fund Reserve. She explained that the Rainy Day Fund is a part of the <br /> City Council Minutes Page 5 of 11 May 31,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.