My WebLink
|
Help
|
About
|
Sign Out
4_Exhibits A-C
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2022
>
11-09
>
4_Exhibits A-C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2022 3:22:16 PM
Creation date
11/2/2022 3:22:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/9/2022
DESTRUCT DATE
15Y
Document Relationships
4
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2022\11-09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—City of Pleasanton 2023-2031 (6th Cycle) Housing Element Update <br />Draft Program EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-26 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480022/EIR/3 - Draft/21480022 Sec00-03 Executive Summary.docx <br />Impacts Mitigation Measures Level of Significance After Mitigation <br />Impact TRANS-4: Development consistent with the <br />Housing Element Update, rezonings, and General Plan and <br />Specific Plan Amendments would not result in inadequate <br />emergency access. <br />No mitigation is necessary. Less than significant impact. <br />Section 3.15—Utilities and Service Systems <br />Impact UTIL-1: Development consistent with the Housing <br />Element Update, rezonings, and General Plan and Specific <br />Plan Amendments would not require or result in the <br />relocation or construction of new or expanded water, <br />wastewater treatment or stormwater drainage, electric <br />power, natural gas, or telecommunications facilities, the <br />construction or relocation of which could cause significant <br />environmental effects. <br />No mitigation is necessary. Less than significant impact. <br />Impact UTIL-2: Development consistent with the Housing <br />Element Update, rezonings, and General Plan and Specific <br />Plan Amendments would not have sufficient water <br />supplies available to serve the project and reasonably <br />foreseeable future development during normal, dry and <br />multiple dry years. <br />None available. Significant and unavoidable. <br />Impact UTIL-3: Development consistent with the Housing <br />Element Update, rezonings, and General Plan and Specific <br />Plan Amendments would not result in a determination by <br />the wastewater treatment provider which serves or may <br />serve the project that it has adequate capacity to serve <br />the project’s projected demand in addition to the <br />provider’s existing commitments. <br />No mitigation is necessary. Less than significant impact. <br />Impact UTIL-4: Development consistent with the Housing <br />Element Update, rezonings, and General Plan and Specific <br />Plan Amendments would not generate solid waste in <br />excess of State or local standards, or in excess of the <br />capacity of local infrastructure, or otherwise impair the <br />attainment of solid waste reduction goals. In addition, the <br />development consistent with the Housing Element <br />No mitigation is necessary. Less than significant impact.
The URL can be used to link to this page
Your browser does not support the video tag.