My WebLink
|
Help
|
About
|
Sign Out
2_Exhibits A-E
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2022
>
11-09
>
2_Exhibits A-E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2022 2:23:25 PM
Creation date
11/2/2022 2:18:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/9/2022
DESTRUCT DATE
15Y
Document Relationships
2
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2022\11-09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PUD-145 Planning Commission <br />Page 8 of 17 <br />Stormwater Treatment Measure Maintenance Agreement between the City and property owner to <br />assure long-term maintenance of the installed measures. The City will provide a template <br />agreement. Once executed, the agreement must be recorded against the property. <br /> (Address this condition prior to plan approval) <br /> <br />44. GEOTECHNICAL RECOMMENDATIONS: Recommendations from the project’s geotechnical <br />investigation, as prepared by a California-licensed Geotechnical Engineer or Certified Engineering <br />Geologist, shall be incorporated into the design of the improvements and/or explicitly noted on the <br />plans. The author(s) of the geotechnical investigation shall certify on the plans that the design <br />complies with their recommendations. During construction, the applicant must follow all <br />recommendations. <br /> (Address this condition prior to plan approval) <br />45. SUBDIVISION MAPS: The subdivision of land is governed by Pleasanton Municipal Code Title <br />19, as well as the California Government Code §§66410-66499.85 (Subdivision Map Act). All <br />maps are subject to review and approval by the City Engineer. Recordation of the subdivision <br />map shall be coordinated by the applicant’s title company, with one full-sized mylar copy of the <br />recorded map returned to the City. <br /> <br />The following statement shall be included on the cover sheet of the map: “I, Stephen M. <br />Kirkpatrick, P.E., City Engineer of the City of Pleasanton, County of Alameda, State of California, <br />do hereby state that I have examined the herein embodied map entitled “[MAP NAME/NUMBER]” <br />consisting of [NUMBER OF SHEETS] sheets, this statement being on Sheet 1 thereof and that the <br />[PARCEL OR TRACT] map was presented to me as provided by local ordinance. This map <br />conforms with the requirements of the Subdivision Map Act and of any local ordinances applicable <br />at the time of approval of the tentative map, and the subdivision as shown is substantially the <br />same as it appeared on the tentative map, if any, and any approved alterations thereof. The name <br />of the subdivider is as shown on the statement of owner upon this sheet.” <br /> <br />For parcel maps, add the following: “The dedications and/or easements shown as [LIST] upon said <br />map thereon offered for dedication are hereby accepted for the purpose for which offered.” <br /> <br />“Stephen M. Kirkpatrick, P.E., Registration No. 53367, City Engineer, City of Pleasanton, County of <br />Alameda, State of California [SIGNATURE LINE], [DATE], [SPACE FOR STAMP]” <br /> (Address this condition prior to map approval) <br /> <br />46. CITY CLERK’S STATEMENT: For final maps, the following statement shall be included on the <br />cover sheet of the map: “I, Jocelyn Kwong, City Clerk and Clerk of the Council of the City of <br />Pleasanton, County of Alameda, State of California, do hereby state that this final map entitled <br />““[MAP NAME/NUMBER]” consisting of [NUMBER OF SHEETS] sheets, this statement being on <br />Sheet [NUMBER] thereof, was presented to said Council of the City of Pleasanton, as provided by <br />law at a regular meeting held on the [DAY] day of [MONTH], [YEAR] and that said Council of the <br />City of Pleasanton did thereupon by motion duly passed and adopted at said meeting, approved <br />said map and accepted on behalf of the public all parcels of land and easements as offered for <br />dedication to the City of Pleasanton for public use in conformity with the terms of the offer of <br />dedication. The names of the subdividers are as shown on the Owner’s Statement upon Sheet 1. <br />In witness whereof, I have hereunto set my hand this [DAY] day of [MONTH], [YEAR]. Jocelyn <br />Kwong, City Clerk, City of Pleasanton, Alameda County, State of California [SIGNATURE LINE]”. <br /> (Address this condition prior to map approval) <br /> <br />47. SUBDIVISION IMPROVEMENT AGREEMENT: Public improvements required as part of the <br />subdivision must be either completed to the satisfaction of the City Engineer prior to map approval, <br />or guaranteed by a Subdivision Agreement. The agreement requires the applicant to post financial <br />security in the form of either a cash deposit, letter of credit, or surety bonds in amounts equivalent
The URL can be used to link to this page
Your browser does not support the video tag.