Laserfiche WebLink
ATTACHMENT 1 —NOTICE TO PROCEED FOR I PROPERTY#11 <br /> [insert Property address] <br /> I. Site Description <br /> The Site shall include[add written description]. <br /> [include map designating Site on Property] <br /> ll. Charging Stall Description <br /> [Example: EBCE plans to install 10-150 kilowatt dual port direct current fast chargers ("DCFC') in 20 <br /> Charging Stalls at the Property. Each DCFC will be capable of powering 2 Charging Stalls. Please note, the <br /> capacity of the DCFC equipment may change in the final project design. <br /> Per State of California requirements, 2 of the Charging Stalls will comply with the Americans With Disabilities <br /> Act ("ADA'). To accommodate the van accessible ADA requirements, and DCFC equipment requirements <br /> generally based on.final product selection, 2 additional parking spaces may be needed at the Property (for a <br /> total of up to 24 parking spaces). <br /> To accommodate the electrical load of 10 DCFCs at the Property, EBCE will bring in a new PG&E metering <br /> service at a 2-megawatt maximum size. EBCE costs related to the new electrical service will be assumed by <br /> EBCE. The electrical service that powers the Charging Stalls will be EBCE's Renewable 100 electricity product <br /> and EBCE will be responsible for the meter. The Host will not pay any costs associated with the electricity <br /> consumption from this new meter. A new transformer room will be constructed in an area of the southwest corner <br /> of Level 1 of the Property. The transformer room will house the required PG&E transformer. EBCE will <br /> coordinate with PG&E through their Service Planning process, and the City Representative, to confirm this <br /> location.A 3000 Amp switchboard would be in the southwest corner of parking Level 1 as well. <br /> EBCE will seek the procurement of turnkey services from a single vendor, to be selected through a Public Works <br /> Bid Specification solicitation issued by EBCE, that includes final design, equipment, installation, load <br /> management system, ongoing maintenance services, and back-office services (e.g., communications, user <br /> account management, billing, reporting, utility interface application, etc.). The vendor will be under contract <br /> with EBCE and will: <br /> • Construct the new transformer room and install the new transformer in coordination with <br /> PG&E and EBCE <br /> • Install all associated wiring and conduit that enable the operation of the Charging Stalls <br /> (following all applicable building codes, industry standards, and best practices) <br /> • Be responsible for pouring the concrete pads on which the DCFCs will be installed and <br /> designing and installing appropriate physical barriers (barrier posts, wheel stops) for <br /> structural support and protection of the DCFCs <br /> • Mount all equipment in front of the Charging Stalls and will take into consideration <br /> accessibility to cables and plugs as well as connectivity to vehicles <br /> • Be required to incorporate cable management systems in each Charging Stall to keep the <br /> charging cables off the ground <br /> • Ensure the installation of the DCFCs complies with ADA requirements <br /> • Re-stripe the Charging Stalls as needed <br /> • Provide all signage required in consultation with EBCE <br /> • Procure DCFCs and incorporate load management systems <br /> • Provide a credit card payment solution (i.e. kiosk) if the DCFCs procured do not have a <br /> built-in credit card reader to ensure compliance with SB 454 <br /> EBCE will keep the Host updated on a regular cadence of any project design changes and engage the Host in <br /> project construction meetings.] <br /> 4ix I; REV ISFD SV'.i l-6KG <br /> 12 <br />