My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
101822
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2022 4:41:37 PM
Creation date
10/12/2022 4:41:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/18/2022
EXPIRATION DATE
10/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The total funding for the Police Department Training Facility Repairs Project, CIP No. <br /> 22482, is $300,000. This was based on the proposed budget for a rubber bullet trap <br /> system provided by the equipment supplier, Action Targets. This budget only includes <br /> the installation of the trap and does not address the facility modifications required to <br /> install the trap. The anticipated expenditures for the site assessment and design <br /> services total $268,000, leaving a balance of$32,000. The construction cost for <br /> Concept 1 is anticipated to be between $1.2 to $1.5 million based on preliminary input <br /> from the architect. A request for construction funding will be brought forward during the <br /> next CIP development process based on completed construction drawings. <br /> Submitted by: Fiscal Review: Approved by: <br /> 4fe <br /> cr <br /> Stephe Kirkpatrick Susan Hsieh Gerry Beaudin <br /> Director of Engineering Director of Finance City Manager <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.