My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
101822
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2022 4:33:52 PM
Creation date
10/12/2022 4:33:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/18/2022
EXPIRATION DATE
10/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 Exhibit B <br /> TABLE 5.106.5.4.1.1,Raceway Conduit and Panel power Requirements for Medium-and-Heavy- <br /> Duty EVSE <br /> Building type Building Size Number of Off-street Additional capacity Required (kVa) <br /> (sq. ft.) loading spaces for Raceway& Busway and <br /> Transformer& Panel <br /> Grocery 10,000 to 90,000 1 or 2 200 <br /> 3 or Greater 400 <br /> Greater than 1 or Greater 400 <br /> 90,000 <br /> Retail 10,000 to 135,000 1 or 2 200 <br /> 3 or Greater 400 <br /> Greater than 1 or Greater 400 <br /> 135,000 <br /> Warehouse 20,000 to 256,000 1 or 2 200 <br /> 3 or Greater 400 <br /> Greater than 1 or Greater 400 <br /> 256,000 <br /> 20.26.370 Section 5.106.13 added—All-electric buildings. <br /> Section 5.106.13 is added to read as follows: <br /> 5.106.13 All-electric buildings.New construction buildings and qualifying alteration projects shall <br /> comply with Section 5.106.13.1 or 5.106.13.2 so that they do not use combustion equipment or are ready <br /> to facilitate future electrification. <br /> 5.106.13.1.New construction and qualifvin2 alteration projects.All newly constructed buildings shall <br /> be all-electric buildings.Alterations that include replacement of over 50 percent of the existing <br /> foundation for purposes other than a repair or reinforcement as defined in California Existing Building <br /> Code Section 202; or where over 50 percent of the existing framing above the sill plate is removed or <br /> replaced for purposes other than repair, shall be all-electric buildings. If either of these criteria are met <br /> within a three-year period,measured from the date of the most recent previously obtained permit final <br /> date,the project shall be subject to the all-electric buildings requirements. <br /> Tenant improvements shall not be considered new construction. The final determination whether a project <br /> meets the definition of substantial reconstruction/alteration shall be made by the local enforcing agency. <br /> Exceptions: <br /> 1. Nonresidential buildings containing kitchens located in a place of public accommodation, <br /> as defined in the California Building Code Chapter 2,may apply to the local enforcing <br /> agency for a modification to install commercial food heat processing equipment served by <br /> fuel gas. The local enforcing_agency may grant the modification if they find: <br /> a. A business-related need to cook with combustion equipment;and <br /> b. The need cannot be achieved equivalently with an electric heating appliance;and <br /> c. The applicant has installed energy efficient equipment based on Energy Star or <br /> California Energy Wise qualifications,as available. <br /> d. The applicant shall comply with Section 5.106.13.2. <br /> Page 48 of 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.