Laserfiche WebLink
Fee Proposal for Stoneridge Mall Transportation Review <br /> Fehr&Peers <br /> Project Principal-in- Sr.Planner/ ProjeQ Graphics/GIS/ Project Labor Direct <br /> Planner/ Total <br /> Manager Charge EngineerSnei r CAD Coordinator Hours 1 Costs ' <br /> Tasks $340 $285 $200 $165 $155 $135 1 <br /> Task 1-Date Assembly and Review <br /> 1.1 Data Assembly and Review 2 i 1 8 5120 52,455 <br /> Task 2 Intersection Analysis <br /> 21 Scenario 1 2 1 2 16 3 23 5210 54,335 <br /> 2.2 Scenario 2 2 1 4 24 4 t 35 L.. 5310 56.575 <br /> 2.3 Scenario 3 2 1 4 + 24 4 35 5310 56,575 <br /> 2.4 Mitigation 2 € 2 2 t 16 `_; 3 25 5230 $4,925 <br /> Task 3 Stone <br /> ridge MaR Land Osa Evaluation <br /> 3.1 Stoneridge Mall Land Use Evaluation —7 2 1 1 16 1 3 23 5210 $4 420 <br /> Task 4-Multimodal Facilities <br /> 4.1-Pedestrian Network 1 1 8 I 1 1 io $90 $1,885 <br /> 42-Bic cle Network 1 8 1„ 1 10 ,, 590 51,885 <br /> ir- <br /> 43-Transit Network 1 1 4 1 j 7 ` 570 $1,490 <br /> Task 5-Documentation <br /> 5.1 Draft Technical Memorandum_ 4 ( i t <br /> �1 24 16 L 6 51 5440 $9,335 <br /> 5.2 Final Technical Memorandum 2 1 ! 6 ! 1 12 $1201 $2,520 <br /> Total for all Tasks 1MM 8 j 14 154 i 18 , 28 243 $2,200 $46,400: <br /> Notes: <br /> This fee proposal is valid for a period of 90 days from the proposal submittal date. <br /> Actual billing rate at the time of service may vary depending on the final staffing plan at the time the project starts;the overall fee will not be exceeded. <br /> Mileage is billed at the IRS rate plus 10%handling fee <br /> Rates and non-key staff are subject to change at any time,without notice,and within the total budget shown <br /> • <br /> 1 <br />